Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
11/14/2024
Applicant:
Celina Rodriguez
Description:
Bella Tierra Phase 3 1745-130 (Model Master Plan TC-MDP-0823-01363)

Permit Reviews

Permit Number - TC-MDP-0724-00818
Permit Status: Inspections
Permit Description: Bella Tierra Phase 3 1745-130 (Model Master Plan TC-MDP-0823-01363)
Start Date Submittal Complete Date Status  
11/15/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 11/22/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0724-00818
Permit Status: Inspections
Permit Description: Bella Tierra Phase 3 1745-130 (Model Master Plan TC-MDP-0823-01363)
Total Outstanding Activity Conditions - 4
Date Name
07/25/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
11/18/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/18/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/18/2024 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0724-00818
Permit Status: Inspections
Permit Description: Bella Tierra Phase 3 1745-130 (Model Master Plan TC-MDP-0823-01363)
Date Description Comments
11/15/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
07/25/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0724-00818
Permite Description: Bella Tierra Phase 3 1745-130 (Model Master Plan TC-MDP-0823-01363)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/20/2024 COT - RSEL - Electrical Underground N/A Partial Pass Rebar and footings per plan, straps and masa clips in place 12/20/24

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0724-00818
Permit Description: Bella Tierra Phase 3 1745-130 (Model Master Plan TC-MDP-0823-01363)
Total Completed Inspections - 13
Date Description Inspector Results Comments
12/13/2024 COT - RSPL - Backwater Valve Passed 12/13/24 pass
12/13/2024 COT - RSPL - Yard Water Line Passed 12/13/24 pass
12/13/2024 COT - RSPL - Sewer Passed pass
12/13/2024 COT - RSPL - Rough Soil Passed 12/13/24 pass
12/20/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Rebar and footings per plan, straps and masa clips in place 12/20/24
12/20/2024 COT - RSBU - Preslab Passed Rebar and footings per plan, straps and masa clips in place good to pour concrete 12/20/24
12/20/2024 COT - RSEL - Grounding/Bonding Passed Rebar and footings per plan, straps and masa clips in place 12/20/24
01/08/2025 COT - RSBU - Exterior Clips/Sheathing Passed Roof sheathing is properly nailed to trusses, H2.5 clips are installed on exterior walls and trusses, all masa clips are properly secured to bottom plate with nails, and all bolts have washers and nuts installed. Okay to proceed with rough-in of mechanical, electrical, and plumbing.
01/08/2025 COT - RSBU - Roof Nailing Passed Roof sheathing is properly nailed to trusses, H2.5 clips are installed on exterior walls and trusses, all masa clips are properly secured to bottom plate with nails, and all bolts have washers and nuts installed. Okay to proceed with rough-in of mechanical, electrical, and plumbing.
01/08/2025 COT - RSEL - Electrical Underground Passed 1/8/25: No underground electrical required, house has a peninsula counter in kitchen area.
01/30/2025 BULD - Electrical Clearance Passed 1/30/25 Approval for TEP ECO
02/05/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 2-5-25, intermediates approved. Okay to continue with construction.
02/05/2025 COT - RSPL - Gas Pressure Test Passed 2-5-25, approved.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 8 START_V1.PDF DOCUMENTS VIEW
BTIII 8 SIC-2024-11-14_V1.PDF DOCUMENTS VIEW