Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
10/31/2024
Applicant:
Celina Rodriguez
Description:
Bella Tierra Phase 3 1745-130 (Model Master Plan TC-MDP-0823-01363)

Permit Reviews

Permit Number - TC-MDP-0724-00817
Permit Status: Inspections
Permit Description: Bella Tierra Phase 3 1745-130 (Model Master Plan TC-MDP-0823-01363)
Start Date Submittal Complete Date Status  
10/31/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 10/31/2024 REQUIRES RESUBMIT Review Details
11/07/2024 SITE FROM MODEL PERMIT - PRODUCTION v.2 11/18/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0724-00817
Permit Status: Inspections
Permit Description: Bella Tierra Phase 3 1745-130 (Model Master Plan TC-MDP-0823-01363)
Total Outstanding Activity Conditions - 4
Date Name
07/25/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
11/07/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/07/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/07/2024 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0724-00817
Permit Status: Inspections
Permit Description: Bella Tierra Phase 3 1745-130 (Model Master Plan TC-MDP-0823-01363)
Date Description Comments
07/25/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0724-00817
Permite Description: Bella Tierra Phase 3 1745-130 (Model Master Plan TC-MDP-0823-01363)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
11/27/2024 COT - RSEL - Grounding/Bonding N/A Partial Pass Concrete forms are set, post tension cabling is in place and properly spaced, masa clips and shear wall hold downs are installed on forms as required, underground plumbing pipes are properly wrapped with foam, underground electrical for kitchen island is installed, and Ufer ground is in place on transformer side of garage. Okay to pour concrete.
01/24/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 1/24/25 missing register on flex in back bathroom, seal penetrations on rear wall by PEX tubing. Fire blocking required at all penetrations at top plates.

re inspection required.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0724-00817
Permit Description: Bella Tierra Phase 3 1745-130 (Model Master Plan TC-MDP-0823-01363)
Total Completed Inspections - 11
Date Description Inspector Results Comments
11/21/2024 COT - RSPL - Yard Water Line Passed Water line on 60psi air test. Okay to backfill. Shading required. 11/21/2024
11/22/2024 COT - RSPL - Rough Soil Passed 11/22/24: stack is top out with water, big rocks have been removed from trenches. underground plumbing is connected to main sewer line. Okay to shade pipe and backfill trenches.
11/22/2024 COT - RSPL - Sewer Passed 11/22/24: stack is top out with water, big rocks have been removed from trenches. underground plumbing is connected to main sewer line. Okay to shade pipe and backfill trenches.
11/27/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, post tension cabling is in place and properly spaced, masa clips and shear wall hold downs are installed on forms as required, underground plumbing pipes are properly wrapped with foam, underground electrical for kitchen island is installed, and Ufer ground is in place on transformer side of garage. Okay to pour concrete.
11/27/2024 COT - RSBU - Preslab Passed Concrete forms are set, post tension cabling is in place and properly spaced, masa clips and shear wall hold downs are installed on forms as required, underground plumbing pipes are properly wrapped with foam, underground electrical for kitchen island is installed, and Ufer ground is in place on transformer side of garage. Okay to pour concrete.
11/27/2024 COT - RSEL - Electrical Underground Passed Concrete forms are set, post tension cabling is in place and properly spaced, masa clips and shear wall hold downs are installed on forms as required, underground plumbing pipes are properly wrapped with foam, underground electrical for kitchen island is installed, and Ufer ground is in place on transformer side of garage. Okay to pour concrete.
12/17/2024 COT - RSBU - Roof Nailing Passed
12/20/2024 COT - RSBU - Exterior Clips/Sheathing Passed 12/20/24 corrections made
01/24/2025 COT - RSPL - Gas Pressure Test Passed 1/24/25 pass
01/27/2025 COT - RSEL - Grounding/Bonding Passed 1/27/25 pass
01/27/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 1/27/25 pass

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 12 START_V1.PDF DOCUMENTS VIEW
BTIII 12 SIC REVISION_V1.PDF DOCUMENTS VIEW