Permit: TC-MDP-0724-00788
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
1156 E FIMBRES ST
Address NEW:
1156 E FIMBRES ST
Apply Date:
08/16/2024
Applicant:
Mark Alteri
Description:
PV 1882 SFR (Model master plan TC-MDP-0124-00059)
Permit Reviews
Permit Number - TC-MDP-0724-00788
Permit Status: Complete
Permit Description: PV 1882 SFR (Model master plan TC-MDP-0124-00059)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/20/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/26/2024 | REQUIRES RESUBMIT |
| 02/20/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 02/24/2025 | APPROVED |
| 10/01/2024 | RESTAMP - RESIDENTIAL v.1 | 10/07/2024 | APPROVED |
| 01/15/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/15/2025 | REQUIRES RESUBMIT |
| 12/23/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/26/2024 | APPROVED |
| 12/13/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/13/2024 | APPROVED |
| 09/24/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 10/01/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0724-00788
Permit Status: Complete
Permit Description: PV 1882 SFR (Model master plan TC-MDP-0124-00059)
| Date | Description | Comments |
|---|---|---|
| 02/24/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 08/21/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 08/21/2024 | Post-Tension Inspection Report is required. | |
| 07/12/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/12/2024 | NO FINAL UNTIL THE PUBLIC SEWER G-2022-101/#P24WP00018/#P22SC00109 IS ACCEPTED AND RELEASED BY PCRWRD | |
| 08/21/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0724-00788
Permite Description: PV 1882 SFR (Model master plan TC-MDP-0124-00059)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/03/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 2/3/25 see previous notes |
| 02/03/2025 | COT - RSPL - Gas Pressure Test | N/A | Re-inspection required | 2/3/25 see previous notes |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0724-00788
Permit Description: PV 1882 SFR (Model master plan TC-MDP-0124-00059)
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/21/2024 | COT - RSPL - Backwater Valve | Passed | Okay to backfill. Shading required. 10/21/2024 | |
| 10/21/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 10/21/2024 | |
| 10/21/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 10/21/2024 | |
| 10/21/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 10/21/2024 | |
| 10/28/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Corrections made 10/28/24 | |
| 11/26/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Ok to cover exterior walls. | |
| 11/26/2024 | COT - RSBU - Roof Nailing | Passed | OK to dry-in roof system | |
| 12/04/2024 | COT - RSBU - Preslab | Passed | ||
| 02/05/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 2/5/25 corrections have been made and approved. Pass. | |
| 02/06/2025 | COT - RSPL - Gas Pressure Test | Passed | pass | |
| 02/14/2025 | COT - RSBU - Interior Shear Bracing | Passed | Sheetrocked throughout | |
| 03/19/2025 | BULD - Electrical Clearance | Passed | Ok to set meter and new service | |
| 04/23/2025 | COT - BULD - SWG Clearance | Passed | 4/23/25: SWG CLEARANCE OK FOR METER TAG | |
| 06/26/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 06/26/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 06/26/2025 | RSBU - Building Progress | Passed | ||
| 07/14/2025 | COT - RSEL - Electrical Final | Passed | 7-14-25: electrical final approved. | |
| 07/14/2025 | COT - RSEL - Outdoor Lighting | Passed | 7-14-25: outdoor lighting approved. | |
| 07/14/2025 | COT - RSME - Mechanical Final | Passed | 7-14-25: mechanical final approved. | |
| 07/14/2025 | COT - RSPL - Plumbing Final | Passed | 7-14-25: plumbing final approved. | |
| 07/14/2025 | ENGR Engineering Final | Passed | Site is clean and safe, everything is in accordance with approved plans. CofO ready. | |
| 07/14/2025 | RSBU - Building Final | Passed | 7-14-25: building final approved. |