Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
6529 E PASEO ALGA
Apply Date:
07/01/2024
Applicant:
Brianna Quiroz
Description:
Harding SFR Model La Estancia (roof vent update)

Permit Reviews

Permit Number - TC-MDP-0724-00782
Permit Status: Complete
Permit Description: Harding SFR Model La Estancia (roof vent update)
Start Date Submittal Complete Date Status  
02/21/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/21/2025 REQUIRES RESUBMIT Review Details
07/12/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 07/23/2024 APPROVED Review Details
02/21/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 02/26/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0724-00782
Permit Status: Complete
Permit Description: Harding SFR Model La Estancia (roof vent update)
Date Description Comments
07/23/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
07/17/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/17/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/17/2024 Post-Tension Inspection Report is required.
07/08/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/08/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
07/17/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
07/17/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0724-00782
Permite Description: Harding SFR Model La Estancia (roof vent update)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
03/11/2025 COT - RSEL - Electrical Final N/A Re-inspection required 3-11-25, install a 30 amp breaker at panel to match max fuse disconnect.
03/11/2025 COT - RSME - Mechanical Final N/A Re-inspection required 3-11-25, install a 30 amp breaker at panel to match max fuse disconnect.
03/11/2025 RSBU - Building Final N/A Re-inspection required 3-11-25, install a 30 amp breaker at panel to match max fuse disconnect.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0724-00782
Permit Description: Harding SFR Model La Estancia (roof vent update)
Total Completed Inspections - 21
Date Description Inspector Results Comments
10/01/2024 COT - BULD - SWG Clearance Passed
10/01/2024 COT - RSEL - Electrical Underground Passed
10/01/2024 COT - RSPL - Gas Pressure Test Passed
10/01/2024 COT - RSPL - Rough Soil Passed Plans will be revised on VTR and plumbing locations. Okay to proceed. Shading is required. 10/1/2024
10/01/2024 COT - RSPL - Sewer Passed Plans will be revised on VTR and plumbing locations. Okay to proceed. Shading is required. 10/1/2024
10/01/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 10/1/2024
10/08/2024 COT - RSEL - Grounding/Bonding Passed
10/08/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
10/08/2024 COT - RSBU - Preslab Passed
11/07/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 11-7-24, items from previous inspection have been corrected. Okay to continue construction.
01/06/2025 BULD - Electrical Clearance Passed Ready for temp power clearance ECO 1/6/25
01/08/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 1/8/25 corrections made
01/09/2025 COT - RSBU - Roof Nailing Passed Passed per Fernando at clip and nail
01/27/2025 COT - RSBU - Interior Shear Bracing Passed 1/27/25 pass
03/11/2025 COT - RSEL - Outdoor Lighting Passed 3-11-25, approved
03/11/2025 COT - RSPL - Plumbing Final Passed 3-11-25, plumbing final approved
03/11/2025 ENGR Engineering Final Passed
03/11/2025 RSBU - Building Progress Passed
03/12/2025 COT - RSEL - Electrical Final Passed 3/12/25 corrections made
03/12/2025 COT - RSME - Mechanical Final Passed 3/12/25 corrections made
03/12/2025 RSBU - Building Final Passed 3/12/25 corrections made

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BLOCK 6 LOT 17 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LA ESTANCIA BLOCK 6 LOT 17 FINAL SIC-2024-07-11_V1.PDF DOCUMENTS VIEW