Permit: TC-MDP-0724-00782
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6529 E PASEO ALGA
Address NEW:
6529 E PASEO ALGA
Apply Date:
07/01/2024
Applicant:
Brianna Quiroz
Description:
Harding SFR Model La Estancia (roof vent update)
Permit Reviews
Permit Number - TC-MDP-0724-00782
Permit Status: Complete
Permit Description: Harding SFR Model La Estancia (roof vent update)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/21/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/21/2025 | REQUIRES RESUBMIT |
| 07/12/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 07/23/2024 | APPROVED |
| 02/21/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 02/26/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0724-00782
Permit Status: Complete
Permit Description: Harding SFR Model La Estancia (roof vent update)
| Date | Description | Comments |
|---|---|---|
| 07/23/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 07/17/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 07/17/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 07/17/2024 | Post-Tension Inspection Report is required. | |
| 07/08/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/08/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 07/17/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 07/17/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0724-00782
Permite Description: Harding SFR Model La Estancia (roof vent update)
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/11/2025 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 3-11-25, install a 30 amp breaker at panel to match max fuse disconnect. |
| 03/11/2025 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 3-11-25, install a 30 amp breaker at panel to match max fuse disconnect. |
| 03/11/2025 | RSBU - Building Final | N/A | Re-inspection required | 3-11-25, install a 30 amp breaker at panel to match max fuse disconnect. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0724-00782
Permit Description: Harding SFR Model La Estancia (roof vent update)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/01/2024 | COT - BULD - SWG Clearance | Passed | ||
| 10/01/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 10/01/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 10/01/2024 | COT - RSPL - Rough Soil | Passed | Plans will be revised on VTR and plumbing locations. Okay to proceed. Shading is required. 10/1/2024 | |
| 10/01/2024 | COT - RSPL - Sewer | Passed | Plans will be revised on VTR and plumbing locations. Okay to proceed. Shading is required. 10/1/2024 | |
| 10/01/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 10/1/2024 | |
| 10/08/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/08/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 10/08/2024 | COT - RSBU - Preslab | Passed | ||
| 11/07/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 11-7-24, items from previous inspection have been corrected. Okay to continue construction. | |
| 01/06/2025 | BULD - Electrical Clearance | Passed | Ready for temp power clearance ECO 1/6/25 | |
| 01/08/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 1/8/25 corrections made | |
| 01/09/2025 | COT - RSBU - Roof Nailing | Passed | Passed per Fernando at clip and nail | |
| 01/27/2025 | COT - RSBU - Interior Shear Bracing | Passed | 1/27/25 pass | |
| 03/11/2025 | COT - RSEL - Outdoor Lighting | Passed | 3-11-25, approved | |
| 03/11/2025 | COT - RSPL - Plumbing Final | Passed | 3-11-25, plumbing final approved | |
| 03/11/2025 | ENGR Engineering Final | Passed | ||
| 03/11/2025 | RSBU - Building Progress | Passed | ||
| 03/12/2025 | COT - RSEL - Electrical Final | Passed | 3/12/25 corrections made | |
| 03/12/2025 | COT - RSME - Mechanical Final | Passed | 3/12/25 corrections made | |
| 03/12/2025 | RSBU - Building Final | Passed | 3/12/25 corrections made |