Permit: TC-MDP-0724-00780
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6544 E PASEO ALGA
Address NEW:
6544 E PASEO ALGA
Apply Date:
07/01/2024
Applicant:
Brianna Quiroz
Description:
Harding SFR Model La Estancia (roof vent update)
Permit Reviews
Permit Number - TC-MDP-0724-00780
Permit Status: Complete
Permit Description: Harding SFR Model La Estancia (roof vent update)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/21/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/21/2025 | REQUIRES RESUBMIT |
| 07/12/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 07/23/2024 | APPROVED |
| 02/27/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 03/10/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0724-00780
Permit Status: Complete
Permit Description: Harding SFR Model La Estancia (roof vent update)
| Date | Description | Comments |
|---|---|---|
| 07/23/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 07/17/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 07/17/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 07/17/2024 | Post-Tension Inspection Report is required. | |
| 07/08/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/08/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 07/17/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 07/17/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0724-00780
Permit Description: Harding SFR Model La Estancia (roof vent update)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/09/2024 | COT - BULD - SWG Clearance | Passed | ||
| 10/09/2024 | COT - RSEL - Electrical Underground | Passed | Okay to backfill. Shading required. 10/9/2024 | |
| 10/09/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 10/09/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 10/9/2024 | |
| 10/09/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 10/9/2024 | |
| 10/09/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 10/9/2024 | |
| 10/17/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 10/17/2024 | COT - RSBU - Preslab | Passed | ||
| 10/17/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 11/19/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 11-19-24, exterior clips/sheathing, roof nailing and truss calcs per approved plans. Okay to continue with construction. | |
| 11/19/2024 | COT - RSBU - Roof Nailing | Passed | 11-19-24, exterior clips/sheathing, roof nailing and truss calcs per approved plans. Okay to continue with construction. | |
| 01/09/2025 | BULD - Electrical Clearance | Passed | Ready for temp power CLEARANCE ECO 1/9/25 | |
| 01/13/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Rebar and hold downs per plan, ok to pour concrete 1/13/25 | |
| 01/23/2025 | COT - RSBU - Interior Shear Bracing | Passed | 1/23/25 pass | |
| 03/24/2025 | COT - RSEL - Electrical Final | Passed | Passed final 3/24/25 CLEARANCE ECO | |
| 03/24/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 3/24/25 | |
| 03/24/2025 | COT - RSME - Mechanical Final | Passed | Passed final 3/24/25 | |
| 03/24/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 3/24/25 | |
| 03/24/2025 | ENGR Engineering Final | Passed | CO Ready Tree needs to be tied off |
|
| 03/24/2025 | RSBU - Building Final | Passed | Passed final 3/24/25 | |
| 03/24/2025 | RSBU - Building Progress | Passed | Passed final 3/24/25 |