Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
3014 N SIBLEY MINE RD
Apply Date:
08/19/2024
Applicant:
Description:
SFR K35G T21-M0033

Permit Reviews

Permit Number - TC-MDP-0724-00778
Permit Status: Inspections complete
Permit Description: SFR K35G T21-M0033
Start Date Submittal Complete Date Status  
08/22/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 08/26/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0724-00778
Permit Status: Inspections complete
Permit Description: SFR K35G T21-M0033
Total Outstanding Activity Conditions - 4
Date Name
07/08/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
08/26/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/26/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/26/2024 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0724-00778
Permit Status: Inspections complete
Permit Description: SFR K35G T21-M0033
Date Description Comments
07/08/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/26/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0724-00778
Permit Description: SFR K35G T21-M0033
Total Completed Inspections - 22
Date Description Inspector Results Comments
09/10/2024 COT - RSPL - Backwater Valve Passed 9/10/24: Plumbing underground per plans ok to proceed with backfill. Shading required
09/10/2024 COT - RSPL - Rough Soil Passed 9/10/24: Plumbing underground per plans ok to proceed with backfill. Shading required
09/10/2024 COT - RSPL - Sewer Passed 9/10/24: Plumbing underground per plans ok to proceed with backfill. Shading required
09/10/2024 COT - RSPL - Yard Water Line Passed 9/10/24: Plumbing underground per plans ok to proceed with backfill. Shading required
09/18/2024 COT - RSBU - Preslab Passed
09/18/2024 COT - RSEL - Electrical Underground Passed
09/18/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
10/04/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
10/04/2024 COT - RSBU - Roof Nailing Passed
11/05/2024 COT - RSEL - Grounding/Bonding Passed
11/05/2024 BULD - Electrical Clearance Passed
11/05/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/06/2024 COT - RSPL - Gas Pressure Test Passed
11/18/2024 COT - RSBU - Interior Shear Bracing Passed
01/13/2025 COT - BULD - SWG Clearance Passed
01/16/2025 COT - RSEL - Electrical Final Passed
01/16/2025 COT - RSEL - Outdoor Lighting Passed
01/16/2025 COT - RSME - Mechanical Final Passed
01/16/2025 COT - RSPL - Plumbing Final Passed
01/16/2025 ENGR Engineering Final Passed
01/16/2025 RSBU - Building Final Passed
01/16/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-08-19_V1.PDF DOCUMENTS VIEW