Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
07/02/2024
Applicant:
Joshua Swinney
Description:
Roosevelt Model SFR La Estancia

Permit Reviews

Permit Number - TC-MDP-0724-00774
Permit Status: Inspections
Permit Description: Roosevelt Model SFR La Estancia
Start Date Submittal Complete Date Status  
07/12/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 07/23/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0724-00774
Permit Status: Inspections
Permit Description: Roosevelt Model SFR La Estancia
Total Outstanding Activity Conditions - 5
Date Name
07/08/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
07/17/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/17/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/17/2024 Post-Tension Inspection Report is required.
07/17/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0724-00774
Permit Status: Inspections
Permit Description: Roosevelt Model SFR La Estancia
Date Description Comments
07/08/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/17/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0724-00774
Permit Description: Roosevelt Model SFR La Estancia
Total Completed Inspections - 11
Date Description Inspector Results Comments
10/01/2024 COT - BULD - SWG Clearance Passed
10/01/2024 COT - RSEL - Electrical Underground Passed
10/01/2024 COT - RSPL - Gas Pressure Test Passed
10/01/2024 COT - RSPL - Rough Soil Passed Plans will be revised on VTR and plumbing locations. Okay to proceed. Shading is required. 10/1/2024
10/01/2024 COT - RSPL - Sewer Passed Plans will be revised on VTR and plumbing locations. Okay to proceed. Shading is required. 10/1/2024
10/01/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 10/1/2024
10/08/2024 COT - RSEL - Grounding/Bonding Passed
10/08/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
10/08/2024 COT - RSBU - Preslab Passed
11/07/2024 COT - RSBU - Exterior Clips/Sheathing Passed 11-7-24, items from previous inspection have been corrected. Okay to continue construction.
11/07/2024 COT - RSBU - Roof Nailing Passed 11-7-24, items from previous inspection have been corrected. Okay to continue construction.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BLOCK 6 LOT 18 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LA ESTANCIA BLOCK 6 LOT 18 FINAL SIC-2024-07-11_V1.PDF DOCUMENTS VIEW