Permit: TC-MDP-0724-00773
Permit Details
Apply Date:
07/02/2024
Applicant:
Joshua Swinney
Description:
Roosevelt Model SFR La Estancia
Permit Reviews
Permit Number - TC-MDP-0724-00773
Permit Status: Inspections
Permit Description: Roosevelt Model SFR La Estancia
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/12/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 07/23/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0724-00773
Permit Status: Inspections
Permit Description: Roosevelt Model SFR La Estancia
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
07/08/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
07/17/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
07/17/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
07/17/2024 | Post-Tension Inspection Report is required. |
07/17/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0724-00773
Permit Status: Inspections
Permit Description: Roosevelt Model SFR La Estancia
Date | Description | Comments |
---|---|---|
07/08/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
07/17/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0724-00773
Permit Description: Roosevelt Model SFR La Estancia
Total Completed Inspections - 11
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/09/2024 | COT - BULD - SWG Clearance | Passed | ||
10/09/2024 | COT - RSEL - Electrical Underground | Passed | Okay to backfill. Shading required. 10/9/2024 | |
10/09/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
10/09/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 10/9/2024 | |
10/09/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 10/9/2024 | |
10/09/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 10/9/2024 | |
10/17/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
10/17/2024 | COT - RSBU - Preslab | Passed | ||
10/17/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
11/14/2024 | COT - RSBU - Roof Nailing | Passed | 11-14-24, exterior clip/sheathing, roof nailing, and truss bracing verified as per approved plans. Okay to continue construction. | |
11/14/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | 11-14-24, exterior clip/sheathing, roof nailing, and truss bracing verified as per approved plans. Okay to continue construction. |