Permit: TC-MDP-0724-00770
Permit Details
Apply Date:
07/11/2024
Applicant:
Brianna Quiroz
Description:
Roosevelt Model SFR La Estancia
Permit Reviews
Permit Number - TC-MDP-0724-00770
Permit Status: Issued
Permit Description: Roosevelt Model SFR La Estancia
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/12/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 07/17/2024 | APPROVED |
01/24/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/27/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0724-00770
Permit Status: Issued
Permit Description: Roosevelt Model SFR La Estancia
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
01/27/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
01/27/2025 | Post-Installed Anchor Inspection Report is required. |
07/08/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
07/17/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
07/17/2024 | Post-Tension Inspection Report is required. |
07/17/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0724-00770
Permit Status: Issued
Permit Description: Roosevelt Model SFR La Estancia
Date | Description | Comments |
---|---|---|
07/08/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
07/17/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0724-00770
Permit Description: Roosevelt Model SFR La Estancia
Total Completed Inspections - 14
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/21/2024 | COT - BULD - SWG Clearance | Passed | 1-21-24, na | |
10/21/2024 | COT - RSPL - Gas Pressure Test | Passed | 10-21-24, na | |
10/21/2024 | COT - RSPL - Rough Soil | Passed | 10-21-24, plumbing underground approved. Okay to backfill. | |
10/21/2024 | COT - RSPL - Sewer | Passed | 10-21-24, sewer connection approved. | |
10/21/2024 | COT - RSPL - Yard Water Line | Passed | 21-24, main water line approved.Okay to backfill. | |
10/21/2024 | COT - RSEL - Electrical Underground | Passed | 10-21-24, not apply | |
11/04/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 11-4-24 setbacks per approved plans. Okay to pour concrete. | |
11/04/2024 | COT - RSBU - Preslab | Passed | 11-4-24, preslab per approved plans. Okay to pour concrete. | |
11/04/2024 | COT - RSEL - Grounding/Bonding | Passed | 11-4-24 grounding/bonding per approved plans. Okay to pour concrete. | |
01/10/2025 | BULD - Electrical Clearance | Passed | Electrical clearance ECO READY FOR TEMP POWER | |
01/15/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 1/15/25 ok to drywall | |
01/30/2025 | COT - RSBU - Interior Shear Bracing | Passed | 1/30/25 pass | |
01/30/2025 | COT - RSBU - Roof Nailing | Passed | 1/30/25 letter from framer is uploaded and on site with stamp of approval. Pass | |
01/30/2025 | COT - RSBU - Exterior Clips/Sheathing | Passed | 1/30/25 letter from framer is uploaded and on site with stamp of approval. Pass |