Permit Number - TC-MDP-0724-00769
Permit Status: Complete
Permit Description: Roosevelt Model SFR La Estancia
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/19/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 09/24/2024 | APPROVED |
| 03/27/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/01/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0724-00769
Permit Status: Complete
Permit Description: Roosevelt Model SFR La Estancia
| Date | Description | Comments |
|---|---|---|
| 09/23/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 09/23/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 09/23/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 09/23/2024 | Post-Tension Inspection Report is required. | |
| 07/08/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/08/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 09/23/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 09/23/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0724-00769
Permite Description: Roosevelt Model SFR La Estancia
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/22/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 10/22/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0724-00769
Permit Description: Roosevelt Model SFR La Estancia
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/22/2024 | COT - RSEL - Electrical Underground | Passed | Passed initial plumbing and underground electrical inspection 10/22/24 | |
| 10/22/2024 | COT - RSPL - Rough Soil | Passed | Passed initial plumbing and underground electrical inspection 10/22/24 | |
| 10/22/2024 | COT - RSPL - Sewer | Passed | Passed initial plumbing inspection 10/22/24 | |
| 10/29/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 10-29-24, setbacks per approved plans. Okay to pour concrete. | |
| 10/29/2024 | COT - RSEL - Grounding/Bonding | Passed | 10-29-24, grounding/bonding per approved plans. Okay to pour concrete. | |
| 10/29/2024 | COT - RSBU - Preslab | Passed | 10-29-24, preslab inspection approved. Okay to pour concrete. | |
| 12/16/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Shear walls, trusses and tie downs per plan, roof tight 12/16/24 | |
| 12/16/2024 | COT - RSBU - Roof Nailing | Passed | Shear walls, trusses and tie downs per plan, roof tight 12/16/24 | |
| 01/13/2025 | BULD - Electrical Clearance | Passed | Passed, ready for temp power 1/13/25 CLEARANCE ECO | |
| 02/06/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 2/6/25 ok to drywall | |
| 02/05/2025 | COT - RSPL - Yard Water Line | Passed | Passed, ok to backfill | |
| 02/24/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 04/21/2025 | COT - RSEL - Electrical Final | Passed | Passed final 4/21/25 | |
| 04/21/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 4/21/25 | |
| 04/21/2025 | COT - RSME - Mechanical Final | Passed | Passed final 4/21/25 | |
| 04/21/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 4/21/25 | |
| 04/21/2025 | ENGR Engineering Final | Passed | CO READY | |
| 04/21/2025 | RSBU - Building Final | Passed | Passed final 4/21/25 | |
| 04/21/2025 | RSBU - Building Progress | Passed | Passed final 4/21/25 |