Permit: TC-MDP-0724-00768
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6505 E PASEO ALGA
Address NEW:
6505 E PASEO ALGA
Apply Date:
09/15/2024
Applicant:
Brianna Quiroz
Description:
Harding SFR Model La Estancia (roof vent update)
Permit Reviews
Permit Number - TC-MDP-0724-00768
Permit Status: Complete
Permit Description: Harding SFR Model La Estancia (roof vent update)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/29/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 11/15/2024 | APPROVED |
| 04/25/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/28/2025 | APPROVED |
| 09/19/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 09/24/2024 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0724-00768
Permit Status: Complete
Permit Description: Harding SFR Model La Estancia (roof vent update)
| Date | Description | Comments |
|---|---|---|
| 09/23/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 11/15/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 09/23/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 09/23/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 09/23/2024 | Post-Tension Inspection Report is required. | |
| 07/08/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/08/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 09/23/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 09/23/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0724-00768
Permite Description: Harding SFR Model La Estancia (roof vent update)
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/16/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | No gas in house |
| 12/16/2024 | COT - RSEL - Electrical Underground | N/A | Not Applicable | |
| 12/23/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | No gas in unit |
| 12/12/2024 | COT - RSPL - Yard Water Line | N/A | Not Ready | not on test 12/12/24 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0724-00768
Permit Description: Harding SFR Model La Estancia (roof vent update)
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/16/2024 | COT - RSPL - Rough Soil | Passed | Passed 12/16/24 good to backfill | |
| 12/16/2024 | COT - RSPL - Sewer | Passed | Passed 12/16/24 good to backfill | |
| 12/23/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 12/23/24 passed Preslab, ok to pour concrete | |
| 12/23/2024 | COT - RSBU - Preslab | Passed | 12/23/24 passed Preslab, ok to pour concrete | |
| 12/23/2024 | COT - RSEL - Grounding/Bonding | Passed | 12/23/24 passed Preslab, ok to pour concrete | |
| 01/24/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 1/24/25 shear walls needed nails, contractor corrected while inspection was in progress. Nails on upper interior framing were,also added. | |
| 01/24/2025 | COT - RSBU - Roof Nailing | Passed | 1/24/25 pass | |
| 02/18/2025 | COT - RSPL - Yard Water Line | Passed | 2/18/25 pass | |
| 02/18/2025 | BULD - Electrical Clearance | Passed | 2/18/25 approval for TEP ECO | |
| 02/26/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 03/14/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 05/16/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 05/16/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 05/16/2025 | ENGR Engineering Final | Passed | CO Ready | |
| 05/16/2025 | RSBU - Building Progress | Passed | ||
| 05/22/2025 | COT - RSEL - Electrical Final | Passed | 5-22-25: electrical final approved. | |
| 05/22/2025 | COT - RSME - Mechanical Final | Passed | 5-22-25: mechanical final approved. | |
| 05/22/2025 | RSBU - Building Final | Passed | 5-22-25: building final approved. |