Permit: TC-MDP-0724-00766
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6521 E PASEO ALGA
Address NEW:
6521 E PASEO ALGA
Apply Date:
09/15/2024
Applicant:
Brianna Quiroz
Description:
Harding SFR Model La Estancia (roof vent update)
Permit Reviews
Permit Number - TC-MDP-0724-00766
Permit Status: Complete
Permit Description: Harding SFR Model La Estancia (roof vent update)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/19/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 09/24/2024 | APPROVED |
| 01/24/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/27/2025 | APPROVED |
| 03/27/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/01/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0724-00766
Permit Status: Complete
Permit Description: Harding SFR Model La Estancia (roof vent update)
| Date | Description | Comments |
|---|---|---|
| 09/20/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 09/30/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 09/20/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 01/24/2025 | Post-Installed Anchor Inspection Report is required. | |
| 09/20/2024 | Post-Tension Inspection Report is required. | |
| 07/08/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/08/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 09/20/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 09/20/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0724-00766
Permite Description: Harding SFR Model La Estancia (roof vent update)
Total Outstanding Inspections - 7
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/22/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 10/22/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 10/22/2024 | COT - RSPL - Rough Soil | N/A | Re-inspection required | Leak in joint for n downstears toilet, water level not high enough, min 5 feet in pipe |
| 11/04/2024 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Re-inspection required | 11-4-24, no plans on site. |
| 11/04/2024 | COT - RSBU - Preslab | N/A | Re-inspection required | 11-4-24, no plans on site. |
| 11/04/2024 | COT - RSEL - Grounding/Bonding | N/A | Re-inspection required | 11-4-24, no plans on site. |
| 04/22/2025 | RSBU - Building Final | N/A | Re-inspection required | 4-22-25, paint exterior plastic to protect from environment. This includes irrigation conduit. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0724-00766
Permit Description: Harding SFR Model La Estancia (roof vent update)
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/22/2024 | COT - RSEL - Electrical Underground | Passed | Passed initial plumbing and underground electrical inspection 10/22/24 | |
| 10/22/2024 | COT - RSPL - Sewer | Passed | Passed initial plumbing inspection 10/22/24 | |
| 12/16/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Shear walls, trusses and tie downs per plan, roof tight 12/16/24 | |
| 12/16/2024 | COT - RSBU - Roof Nailing | Passed | Shear walls, trusses and tie downs per plan, roof tight 12/16/24 | |
| 01/10/2025 | BULD - Electrical Clearance | Passed | Ready for temp power, clearance ECO | |
| 02/03/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 2/03/25 letter received | |
| 02/03/2025 | COT - RSBU - Preslab | Passed | 2/03/25 letter received | |
| 02/05/2025 | COT - RSPL - Yard Water Line | Passed | Passed, ok to backfill | |
| 02/07/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Corrections made 2/7/25 | |
| 02/21/2025 | COT - RSBU - Interior Shear Bracing | Passed | 2/21/25 pass | |
| 04/21/2025 | COT - RSEL - Grounding/Bonding | Passed | 4/21/25 connection made | |
| 04/21/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 4/21/25 | |
| 04/21/2025 | COT - RSME - Mechanical Final | Passed | Passed final 4/21/25 | |
| 04/21/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 4/21/25 | |
| 04/21/2025 | ENGR Engineering Final | Passed | CO READY | |
| 04/21/2025 | RSBU - Building Progress | Passed | Passed final 4/21/25 | |
| 04/22/2025 | COT - RSEL - Electrical Final | Passed | 4-22-25, electrical final approved. |