Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0723-01301
Permit Details
Apply Date:
08/18/2023
Applicant:
David Martin
Description:
SFR K35G T21-M0033
Permit Reviews
Permit Number - TC-MDP-0723-01301
Permit Status: Inspections complete
Permit Description: SFR K35G T21-M0033
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/19/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/22/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0723-01301
Permit Status: Inspections complete
Permit Description: SFR K35G T21-M0033
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
06/15/2023 | Sewer condition must be accepted and released by Pima County |
08/19/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
08/19/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
08/22/2023 | Post-Tension Inspection Report is required. |
08/22/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0723-01301
Permit Status: Inspections complete
Permit Description: SFR K35G T21-M0033
Date | Description | Comments |
---|---|---|
06/15/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
07/28/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0723-01301
Permit Description: SFR K35G T21-M0033
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/12/2023 | COT - RSPL - Yard Water Line | Passed | ||
10/12/2023 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading is required. 10/12/2023 | |
10/12/2023 | COT - RSPL - Sewer | Passed | ||
10/19/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
10/19/2023 | COT - RSBU - Preslab | Passed | ||
10/19/2023 | COT - RSEL - Electrical Underground | Passed | ||
10/19/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
11/07/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
11/07/2023 | COT - RSBU - Roof Nailing | Passed | ||
12/11/2023 | BULD - Electrical Clearance | Passed | ||
12/11/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
12/11/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
12/22/2023 | COT - RSBU - Interior Shear Bracing | Passed | Sheetrock nailing, Ok to tape throughout. | |
02/09/2024 | COT - BULD - SWG Clearance | Passed | previously approved gas piping and pressure test, SWG Clearance is required for the new meter | |
03/18/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
03/18/2024 | COT - RSME - Mechanical Final | Passed | ||
03/18/2024 | COT - RSPL - Plumbing Final | Passed | ||
03/18/2024 | RSBU - Building Progress | Passed | ||
03/18/2024 | ENGR Engineering Final | Passed | grade cert present. | |
03/19/2024 | COT - RSEL - Electrical Final | Passed | Partial pass. Pending receptacle at hallway entry. 3/18/2024 3/19/24: corrections made |
|
03/19/2024 | RSBU - Building Final | Passed | Partial pass. Pending receptacle at hallway entry. 3/18/2024 3/19/24: corrections made |