Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
07/28/2023
Applicant:
David Martin
Description:
SFR K35D T21-M0032

Permit Reviews

Permit Number - TC-MDP-0723-01294
Permit Status: Complete
Permit Description: SFR K35D T21-M0032
Start Date Submittal Complete Date Status  
11/15/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/16/2023 APPROVED Review Details
08/02/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/04/2023 REQUIRES RESUBMIT Review Details
08/16/2023 SITE FROM MODEL PERMIT - PRODUCTION v.2 08/17/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0723-01294
Permit Status: Complete
Permit Description: SFR K35D T21-M0032
Date Description Comments
08/02/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/02/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/15/2023 Post-Tension Inspection Report is required.
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/25/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Sewer condition must be accepted and released by Pima County
08/03/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0723-01294
Permite Description: SFR K35D T21-M0032
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/13/2023 COT - RSBU - Exterior Clips/Sheathing N/A Re-inspection required 10/13/23: Anchor bolt missing at shear wall 6 in master bedroom (spacing is 32" O.C), 2x4 stud missing on south end of girder truss.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0723-01294
Permit Description: SFR K35D T21-M0032
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/11/2023 COT - RSPL - Rough Soil Passed 9/11/23 Builder (Mark Mattamy Homes) states perimeter wall includes the 5 ft side yard setback. Will approve builder responsible.
09/11/2023 COT - RSPL - Sewer Passed 9/11/23 Builder (Mark Mattamy Homes) states perimeter wall includes the 5 ft side yard setback. Will approve builder responsible.
09/11/2023 COT - RSPL - Yard Water Line Passed 9/11/23 Builder (Mark Mattamy Homes) states perimeter wall includes the 5 ft side yard setback. Will approve builder responsible.
09/20/2023 COT - RSBU - Excavation/Rebar/Zoning Passed Rebar reinforcement is properly installed. Post tension cables are installed. Ufer ground is installed.
09/20/2023 COT - RSBU - Preslab Passed Rebar reinforcement is properly installed. Post tension cables are installed. Ufer ground is installed. Kitchen Island underground is complete.
09/20/2023 COT - RSEL - Electrical Underground Passed Rebar reinforcement is properly installed. Post tension cables are installed. Ufer ground is installed. Kitchen Island underground is complete.
09/20/2023 COT - RSEL - Grounding/Bonding Passed Rebar reinforcement is properly installed. Post tension cables are installed. Ufer ground is installed. Kitchen Island underground is complete.
10/13/2023 COT - RSBU - Roof Nailing Passed
10/16/2023 COT - RSBU - Exterior Clips/Sheathing Passed 10/13/23: Anchor bolt missing at shear wall 6 in master bedroom (spacing is 32" O.C), 2x4 stud missing on south end of girder truss.
10/16/23: corrections made.
11/14/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/16/2023 BULD - Electrical Clearance Passed TEP ECO
12/13/23 clearance resent
11/20/2023 COT - RSPL - Gas Pressure Test Passed
11/27/2023 COT - RSBU - Interior Shear Bracing Passed
01/23/2024 COT - BULD - SWG Clearance Passed
02/02/2024 COT - RSEL - Outdoor Lighting Passed
02/02/2024 RSBU - Building Progress Passed
02/02/2024 ENGR Engineering Final Passed
02/07/2024 COT - RSEL - Electrical Final Passed
02/07/2024 COT - RSME - Mechanical Final Passed
02/07/2024 COT - RSPL - Plumbing Final Passed
02/07/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
210841 WESTBRIDGE AT SILVERBELL PT REPORT LOT 1_V1.PDF DOCUMENTS VIEW
P22WP00025 FINAL ACCEPTANCE LETTER_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_REVISION_V1.PDF DOCUMENTS VIEW