Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0723-01287
Permit Details
Apply Date:
08/07/2023
Applicant:
David Martin
Description:
SFR K35O T21-M0036
Permit Reviews
Permit Number - TC-MDP-0723-01287
Permit Status: Inspections complete
Permit Description: SFR K35O T21-M0036
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/11/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/14/2024 | APPROVED |
08/08/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/09/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0723-01287
Permit Status: Inspections complete
Permit Description: SFR K35O T21-M0036
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
01/17/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0723-01287
Permit Status: Inspections complete
Permit Description: SFR K35O T21-M0036
Date | Description | Comments |
---|---|---|
08/08/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
01/17/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
06/15/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
07/21/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/15/2023 | Sewer condition must be accepted and released by Pima County |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0723-01287
Permit Description: SFR K35O T21-M0036
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/11/2023 | COT - RSPL - Rough Soil | Passed | ||
09/11/2023 | COT - RSPL - Backwater Valve | Passed | ||
09/11/2023 | COT - RSPL - Sewer | Passed | ||
09/11/2023 | COT - RSPL - Yard Water Line | Passed | ||
09/20/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Rebar reinforcement is properly installed. Post tension cables are installed. Ufer ground is installed. Kitchen Island underground is complete. | |
09/20/2023 | COT - RSBU - Preslab | Passed | ||
09/20/2023 | COT - RSEL - Electrical Underground | Passed | Rebar reinforcement is properly installed. Post tension cables are installed. Ufer ground is installed. Kitchen Island underground is complete. | |
09/20/2023 | COT - RSEL - Grounding/Bonding | Passed | Rebar reinforcement is properly installed. Post tension cables are installed. Ufer ground is installed. Kitchen Island underground is complete. | |
10/19/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
10/19/2023 | COT - RSBU - Roof Nailing | Passed | ||
12/06/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
12/07/2023 | BULD - Electrical Clearance | Passed | TEP ECO | |
12/07/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
12/20/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
02/08/2024 | COT - BULD - SWG Clearance | Passed | Approved, SWG Clearance is required for the new meter | |
03/08/2024 | COT - RSEL - Electrical Final | Passed | ||
03/08/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
03/08/2024 | COT - RSME - Mechanical Final | Passed | ||
03/08/2024 | COT - RSPL - Plumbing Final | Passed | ||
03/08/2024 | RSBU - Building Final | Passed | ||
03/18/2024 | RSBU - Building Progress | Passed | ||
03/08/2024 | ENGR Engineering Final | Passed |