Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
09/06/2023
Applicant:
Ben Smith
Description:
SFR STF40K T20-M0039 Revision Truss Calcs

Permit Reviews

Permit Number - TC-MDP-0723-01286
Permit Status: Issued
Permit Description: SFR STF40K T20-M0039 Revision Truss Calcs
Start Date Submittal Complete Date Status  
09/06/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/08/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0723-01286
Permit Status: Issued
Permit Description: SFR STF40K T20-M0039 Revision Truss Calcs
Total Outstanding Activity Conditions - 7
Date Name
07/20/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
09/06/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/06/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/06/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/06/2023 Post-Tension Inspection Report is required.
09/06/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
09/06/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0723-01286
Permit Status: Issued
Permit Description: SFR STF40K T20-M0039 Revision Truss Calcs
Date Description Comments
07/20/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/21/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
09/06/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0723-01286
Permite Description: SFR STF40K T20-M0039 Revision Truss Calcs
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/12/2024 ENGR Engineering Final N/A Canceled

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0723-01286
Permit Description: SFR STF40K T20-M0039 Revision Truss Calcs
Total Completed Inspections - 20
Date Description Inspector Results Comments
03/07/2024 COT - RSPL - Yard Water Line Passed
03/13/2024 COT - RSPL - Sewer Passed 3/13/24: Underground plumbing is complete and connected to sewer main. Complete system is under a water test with no leaks. Okay to shade pipes and backfill trenches.
03/13/2024 COT - RSPL - Rough Soil Passed 3/13/24: Underground plumbing is complete and connected to sewer main. Complete system is under a water test with no leaks. Okay to shade pipes and backfill trenches.
04/02/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
04/02/2024 COT - RSBU - Preslab Passed
04/02/2024 COT - RSEL - Electrical Underground Passed
04/02/2024 COT - RSEL - Grounding/Bonding Passed
04/19/2024 COT - RSBU - Exterior Clips/Sheathing Passed All exterior walls are properly secured to concrete floor with bolts or by hilti nail gun. All shear wall have the proper Hilti brackets in place and are properly secured to the floor with bolts. All exterior shear walls are properly covered with plywood and nailed off per plans. Windows are properly installed and opening are properly sealed with Tyvek paper. Okay to proceed with dry-in of exterior walls.
04/19/2024 COT - RSBU - Roof Nailing Passed Roof trusses are properly secured to top plate with H2.5 clips. Roof sheathing is secured to rafters per plan. Okay to proceed with dry-in of roof.
05/21/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/21/2024 COT - RSPL - Gas Pressure Test Passed
06/06/2024 COT - RSBU - Interior Shear Bracing Passed
06/11/2024 BULD - Electrical Clearance Passed TEP ECO
07/24/2024 COT - BULD - SWG Clearance Passed Gas valves are installed on all gas pipes in kitchen, laundry, attic, and garage for stove, dryer, heater, and water heater. Okay to install meter and turn on gas.
08/12/2024 COT - RSEL - Electrical Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully operational. Electrical panel is properly labeled with GFCI & AFCI breakers installed as required. Exterior lights are installed per plan requirements. Okay to issue Certificate of Occupancy for this permit.
08/12/2024 COT - RSEL - Outdoor Lighting Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully operational. Electrical panel is properly labeled with GFCI & AFCI breakers installed as required. Exterior lights are installed per plan requirements. Okay to issue Certificate of Occupancy for this permit.
08/12/2024 COT - RSME - Mechanical Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully operational. Electrical panel is properly labeled with GFCI & AFCI breakers installed as required. Exterior lights are installed per plan requirements. Okay to issue Certificate of Occupancy for this permit.
08/12/2024 COT - RSPL - Plumbing Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully operational. Electrical panel is properly labeled with GFCI & AFCI breakers installed as required. Exterior lights are installed per plan requirements. Okay to issue Certificate of Occupancy for this permit.
08/12/2024 RSBU - Building Final Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully operational. Electrical panel is properly labeled with GFCI & AFCI breakers installed as required. Exterior lights are installed per plan requirements. Okay to issue Certificate of Occupancy for this permit.
08/12/2024 RSBU - Building Progress Passed Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully operational. Electrical panel is properly labeled with GFCI & AFCI breakers installed as required. Exterior lights are installed per plan requirements. Okay to issue Certificate of Occupancy for this permit.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-09-06_V1.PDF DOCUMENTS VIEW
SPAPP-P22WP00131 FINAL ACCEPTANCE-2023-09-06_V1.PDF DOCUMENTS VIEW