Permit: TC-MDP-0723-01286
Permit Details
Apply Date:
09/06/2023
Applicant:
Ben Smith
Description:
SFR STF40K T20-M0039 Revision Truss Calcs
Permit Reviews
Permit Number - TC-MDP-0723-01286
Permit Status: Issued
Permit Description: SFR STF40K T20-M0039 Revision Truss Calcs
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/06/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/08/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0723-01286
Permit Status: Issued
Permit Description: SFR STF40K T20-M0039 Revision Truss Calcs
Total Outstanding Activity Conditions - 7
Date | Name |
---|---|
07/20/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
09/06/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
09/06/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
09/06/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
09/06/2023 | Post-Tension Inspection Report is required. |
09/06/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
09/06/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0723-01286
Permit Status: Issued
Permit Description: SFR STF40K T20-M0039 Revision Truss Calcs
Date | Description | Comments |
---|---|---|
07/20/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
07/21/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
09/06/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0723-01286
Permite Description: SFR STF40K T20-M0039 Revision Truss Calcs
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/12/2024 | ENGR Engineering Final | N/A | Canceled |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0723-01286
Permit Description: SFR STF40K T20-M0039 Revision Truss Calcs
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/07/2024 | COT - RSPL - Yard Water Line | Passed | ||
03/13/2024 | COT - RSPL - Sewer | Passed | 3/13/24: Underground plumbing is complete and connected to sewer main. Complete system is under a water test with no leaks. Okay to shade pipes and backfill trenches. | |
03/13/2024 | COT - RSPL - Rough Soil | Passed | 3/13/24: Underground plumbing is complete and connected to sewer main. Complete system is under a water test with no leaks. Okay to shade pipes and backfill trenches. | |
04/02/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
04/02/2024 | COT - RSBU - Preslab | Passed | ||
04/02/2024 | COT - RSEL - Electrical Underground | Passed | ||
04/02/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
04/19/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | All exterior walls are properly secured to concrete floor with bolts or by hilti nail gun. All shear wall have the proper Hilti brackets in place and are properly secured to the floor with bolts. All exterior shear walls are properly covered with plywood and nailed off per plans. Windows are properly installed and opening are properly sealed with Tyvek paper. Okay to proceed with dry-in of exterior walls. | |
04/19/2024 | COT - RSBU - Roof Nailing | Passed | Roof trusses are properly secured to top plate with H2.5 clips. Roof sheathing is secured to rafters per plan. Okay to proceed with dry-in of roof. | |
05/21/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
05/21/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
06/06/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
06/11/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
07/24/2024 | COT - BULD - SWG Clearance | Passed | Gas valves are installed on all gas pipes in kitchen, laundry, attic, and garage for stove, dryer, heater, and water heater. Okay to install meter and turn on gas. | |
08/12/2024 | COT - RSEL - Electrical Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully operational. Electrical panel is properly labeled with GFCI & AFCI breakers installed as required. Exterior lights are installed per plan requirements. Okay to issue Certificate of Occupancy for this permit. | |
08/12/2024 | COT - RSEL - Outdoor Lighting | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully operational. Electrical panel is properly labeled with GFCI & AFCI breakers installed as required. Exterior lights are installed per plan requirements. Okay to issue Certificate of Occupancy for this permit. | |
08/12/2024 | COT - RSME - Mechanical Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully operational. Electrical panel is properly labeled with GFCI & AFCI breakers installed as required. Exterior lights are installed per plan requirements. Okay to issue Certificate of Occupancy for this permit. | |
08/12/2024 | COT - RSPL - Plumbing Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully operational. Electrical panel is properly labeled with GFCI & AFCI breakers installed as required. Exterior lights are installed per plan requirements. Okay to issue Certificate of Occupancy for this permit. | |
08/12/2024 | RSBU - Building Final | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully operational. Electrical panel is properly labeled with GFCI & AFCI breakers installed as required. Exterior lights are installed per plan requirements. Okay to issue Certificate of Occupancy for this permit. | |
08/12/2024 | RSBU - Building Progress | Passed | Construction is complete. Mechanical, electrical, and plumbing fixtures are installed and fully operational. Electrical panel is properly labeled with GFCI & AFCI breakers installed as required. Exterior lights are installed per plan requirements. Okay to issue Certificate of Occupancy for this permit. |