Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
08/17/2023
Applicant:
David Martin
Description:
SFR K35I T21-M0034

Permit Reviews

Permit Number - TC-MDP-0723-01279
Permit Status: Complete
Permit Description: SFR K35I T21-M0034
Start Date Submittal Complete Date Status  
03/08/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/13/2024 APPROVED Review Details
08/18/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/21/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0723-01279
Permit Status: Complete
Permit Description: SFR K35I T21-M0034
Date Description Comments
08/18/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/18/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/18/2023 Post-Tension Inspection Report is required.
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/21/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Sewer condition must be accepted and released by Pima County
08/18/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0723-01279
Permit Description: SFR K35I T21-M0034
Total Completed Inspections - 22
Date Description Inspector Results Comments
10/13/2023 COT - RSPL - Backwater Valve Passed 10/13/23: passed ok to backfill.
10/13/2023 COT - RSPL - Rough Soil Passed 10/13/23: passed ok to backfill.
10/13/2023 COT - RSPL - Sewer Passed 10/13/23: passed ok to backfill.
10/13/2023 COT - RSPL - Yard Water Line Passed 10/13/23: passed ok to backfill.
10/20/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
10/20/2023 COT - RSBU - Preslab Passed
10/20/2023 COT - RSEL - Electrical Underground Passed
10/20/2023 COT - RSEL - Grounding/Bonding Passed
11/09/2023 COT - RSBU - Roof Nailing Passed
11/13/2023 COT - RSBU - Exterior Clips/Sheathing Passed
12/06/2023 BULD - Electrical Clearance Passed TEP eco
12/06/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
12/06/2023 COT - RSPL - Gas Pressure Test Passed
12/18/2023 COT - RSBU - Interior Shear Bracing Passed
02/08/2024 COT - BULD - SWG Clearance Passed Approved, SWG Clearance is required for the new meter
03/05/2024 COT - RSEL - Electrical Final Passed
03/05/2024 COT - RSEL - Outdoor Lighting Passed
03/05/2024 COT - RSME - Mechanical Final Passed
03/05/2024 COT - RSPL - Plumbing Final Passed
03/05/2024 RSBU - Building Final Passed
03/05/2024 RSBU - Building Progress Passed
03/05/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-08-17_V1.PDF DOCUMENTS VIEW