Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
07/28/2023
Applicant:
David Martin
Description:
SFR K35I T21-M0034

Permit Reviews

Permit Number - TC-MDP-0723-01277
Permit Status: Issued
Permit Description: SFR K35I T21-M0034
Start Date Submittal Complete Date Status  
02/14/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/27/2024 APPROVED Review Details
07/28/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 07/31/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0723-01277
Permit Status: Issued
Permit Description: SFR K35I T21-M0034
Total Outstanding Activity Conditions - 3
Date Name
02/14/2024 Post-Tension Inspection Report is required.
07/28/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/28/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.

Conditions

Permit Number - TC-MDP-0723-01277
Permit Status: Issued
Permit Description: SFR K35I T21-M0034
Date Description Comments
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Sewer condition must be accepted and released by Pima County
07/31/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0723-01277
Permit Description: SFR K35I T21-M0034
Total Completed Inspections - 21
Date Description Inspector Results Comments
08/23/2023 COT - RSPL - Rough Soil Passed
08/23/2023 COT - RSPL - Sewer Passed
08/23/2023 COT - RSPL - Yard Water Line Passed
09/06/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
09/06/2023 COT - RSBU - Preslab Passed
09/06/2023 COT - RSEL - Electrical Underground Passed
09/06/2023 COT - RSEL - Grounding/Bonding Passed
09/27/2023 COT - RSBU - Exterior Clips/Sheathing Passed
09/27/2023 COT - RSBU - Roof Nailing Passed
11/01/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/02/2023 BULD - Electrical Clearance Passed TEP ECO
11/14/2023 COT - RSBU - Interior Shear Bracing Passed
11/20/2023 COT - RSPL - Gas Pressure Test Passed
01/17/2024 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 1/17/2024
02/02/2024 COT - RSEL - Outdoor Lighting Passed
02/02/2024 COT - RSPL - Plumbing Final Passed
02/02/2024 RSBU - Building Progress Passed
02/02/2024 ENGR Engineering Final Passed
02/06/2024 COT - RSEL - Electrical Final Passed Corrections were made 2/6/2024
02/06/2024 COT - RSME - Mechanical Final Passed Corrections were made 2/6/2024
02/06/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
23-004 WESTBRIDGE LOTS 1-106, POST GRADE, MATTAMY HOMES - POST GRADE SOIL REPORT_V1.PDF DOCUMENTS VIEW
23-004 WESTBRIDGE LOTS 1-106, POST GRADE, MATTAMY HOMES - POST GRADE SOIL REPORT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-07-28_V1.PDF DOCUMENTS VIEW