Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
09/12/2023
Applicant:
Daria Hopkins
Description:
SFR MERI132021 T21-M0062

Permit Reviews

Permit Number - TC-MDP-0723-01272
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
Start Date Submittal Complete Date Status  
09/13/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/14/2023 APPROVED Review Details
09/18/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/19/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0723-01272
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
Date Description Comments
09/13/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/13/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/13/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/13/2023 Post-Tension Inspection Report is required.
07/20/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
09/19/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
09/13/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
09/13/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0723-01272
Permit Description: SFR MERI132021 T21-M0062
Total Completed Inspections - 22
Date Description Inspector Results Comments
11/15/2023 COT - RSPL - Backwater Valve Passed
11/15/2023 COT - RSPL - Rough Soil Passed
11/15/2023 COT - RSPL - Sewer Passed
11/15/2023 COT - RSPL - Yard Water Line Passed
11/21/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
11/21/2023 COT - RSBU - Preslab Passed
11/21/2023 COT - RSEL - Electrical Underground Passed
11/21/2023 COT - RSEL - Grounding/Bonding Passed
12/18/2023 COT - RSBU - Exterior Clips/Sheathing Passed
12/18/2023 COT - RSBU - Roof Nailing Passed Roof sheathing is properly nailed. Okay to proceed with dry-in of roof.
02/06/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
02/23/2024 COT - RSBU - Interior Shear Bracing Passed
03/22/2024 BULD - Electrical Clearance Passed 3/22/24: ECO TEP CLEARANCE
03/22/2024 COT - RSPL - Gas Pressure Test Passed
04/05/2024 COT - BULD - SWG Clearance Passed
04/30/2024 RSBU - Building Final Passed
04/30/2024 COT - RSEL - Electrical Final Passed
04/30/2024 ENGR Engineering Final Passed
04/30/2024 RSBU - Building Progress Passed
04/30/2024 COT - RSPL - Plumbing Final Passed
04/30/2024 COT - RSEL - Outdoor Lighting Passed
05/03/2024 COT - RSME - Mechanical Final Passed

Documents

File Name Document Type  
144066 PT LOT 64 COMPLETE-2024-09-17_V1.PDF DOCUMENTS VIEW
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 64 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 64 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 64 SPECIAL INSPECTION CERTIFICATE-2023-09-12_V1.PDF DOCUMENTS VIEW