Permit: TC-MDP-0723-01269
Permit Details
Apply Date:
09/12/2023
Applicant:
Daria Hopkins
Description:
SFR MERI132021 T21-M0062
Permit Reviews
Permit Number - TC-MDP-0723-01269
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/13/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/14/2023 | APPROVED |
09/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/19/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0723-01269
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
Date | Description | Comments |
---|---|---|
09/13/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
09/13/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
09/13/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
09/13/2023 | Post-Tension Inspection Report is required. | |
07/20/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
09/19/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
09/13/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
09/13/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0723-01269
Permite Description: SFR MERI132021 T21-M0062
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/07/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | Gas not under test, pex lines within 12” of can lights must be insulated, stud over notched at plumbing cleanout at master bathroom. Add stud shoe. |
02/07/2024 | COT - RSPL - Gas Pressure Test | N/A | Re-inspection required | Gas not under test, pex lines within 12” of can lights must be insulated, stud over notched at plumbing cleanout at master bathroom. Add stud shoe. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0723-01269
Permit Description: SFR MERI132021 T21-M0062
Total Completed Inspections - 22