Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
07/19/2023
Applicant:
Daria Hopkins
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change

Permit Reviews

Permit Number - TC-MDP-0723-01264
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Start Date Submittal Complete Date Status  
07/20/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 07/24/2023 APPROVED Review Details
10/02/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/02/2023 APPROVED Review Details
08/22/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/23/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0723-01264
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Date Description Comments
10/02/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
07/20/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/20/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/02/2023 Post-Tension Inspection Report is required.
07/11/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/20/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/11/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
08/23/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
07/21/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0723-01264
Permite Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
10/16/2023 COT - RSBU - Excavation/Rebar/Zoning N/A Re-inspection required 10/16/23: area at front hold-downs not per plan.
10/16/2023 COT - RSBU - Preslab N/A Re-inspection required 10/16/23: area at front hold-downs not per plan.
10/10/2023 COT - RSPL - Rough Soil N/A Partial Pass
03/20/2024 RSBU - Building Progress N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0723-01264
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 20
Date Description Inspector Results Comments
10/06/2023 COT - RSPL - Yard Water Line Passed
10/16/2023 COT - RSEL - Electrical Underground Passed
10/16/2023 COT - RSEL - Grounding/Bonding Passed
10/17/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
10/17/2023 COT - RSBU - Preslab Passed
11/02/2023 COT - RSBU - Exterior Clips/Sheathing Passed
11/02/2023 COT - RSBU - Roof Nailing Passed
12/22/2023 BULD - Electrical Clearance Passed Clearance for TEP ECO. 12/21/2023
12/22/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
12/22/2023 COT - RSPL - Gas Pressure Test Passed
01/16/2024 COT - RSBU - Interior Shear Bracing Passed
02/28/2024 COT - RSPL - Sewer Passed 2/28/24: HCS Connection made.
11/08/2024 COT - RSPL - Rough Soil Passed 11/8/24: House was completed and final inspections performed on 3/20/24 by R. Chandler.
03/14/2024 COT - BULD - SWG Clearance Passed
03/20/2024 COT - RSEL - Electrical Final Passed
03/20/2024 COT - RSEL - Outdoor Lighting Passed
03/20/2024 COT - RSME - Mechanical Final Passed
03/20/2024 COT - RSPL - Plumbing Final Passed
03/20/2024 RSBU - Building Final Passed
03/21/2024 ENGR Engineering Final Passed concrete driveway at roadway needs repair

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 217 FINAL SPECIAL INSPECTION CERTIFICATE-2024-08-19_V1.PDF DOCUMENTS VIEW
LOT 217 SPECIAL INSPECTION CERTIFICATE-2023-09-28_V1.PDF DOCUMENTS VIEW
PATTISON SIC LETTER 9.27.23_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 217 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 217 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 217 SPECIAL INSPECTION CERTIFICATE-2023-07-20_V1.PDF DOCUMENTS VIEW