Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
10/31/2023
Applicant:
Stephanie Bebee
Description:
SFR CVPLAN2.5 T22-M0062 V2 Structural changes

Permit Reviews

Permit Number - TC-MDP-0723-01259
Permit Status: Complete
Permit Description: SFR CVPLAN2.5 T22-M0062 V2 Structural changes
Start Date Submittal Complete Date Status  
10/31/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 11/02/2023 APPROVED Review Details
06/27/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/28/2024 APPROVED Review Details
02/09/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/12/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0723-01259
Permit Status: Complete
Permit Description: SFR CVPLAN2.5 T22-M0062 V2 Structural changes
Date Description Comments
10/31/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/24/2024 Post-Tension Inspection Report is required.
07/18/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
10/31/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
11/01/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0723-01259
Permite Description: SFR CVPLAN2.5 T22-M0062 V2 Structural changes
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
01/09/2024 COT - RSBU - Exterior Clips/Sheathing N/A Re-inspection required 1/9/24: missing nailing at shear wall in garage. Missing anchor bolts at shear wall by powder room. RSP clips missing nailing and missing at exterior.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0723-01259
Permit Description: SFR CVPLAN2.5 T22-M0062 V2 Structural changes
Total Completed Inspections - 21
Date Description Inspector Results Comments
11/17/2023 COT - RSPL - Yard Water Line Passed
11/17/2023 COT - RSPL - Sewer Passed
11/17/2023 COT - RSPL - Rough Soil Passed
11/27/2023 COT - RSBU - Excavation/Rebar/Zoning Passed Rebar reinforcement is in place for shear wall straps. Post tension cabling is in place.
11/27/2023 COT - RSBU - Preslab Passed okay to pour concrete slab.
11/27/2023 COT - RSEL - Grounding/Bonding Passed Ufer ground is in place, okay to pour concrete.
01/09/2024 COT - RSBU - Roof Nailing Passed
01/12/2024 COT - RSBU - Exterior Clips/Sheathing Passed 1-12-24: Missing nails and anchor bolts have been installed throughout house.
03/04/2024 BULD - Electrical Clearance Passed Panel is properly installed and grounded to the Ufer ground. Okay to install meter and energize system.
03/12/2024 COT - RSPL - Gas Pressure Test Passed
03/13/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 3/13/24: Water supply pex line and DWV are under a pressure test with no leaks. Anchor bolt has been added to shear wall downstairs. Okay to proceed with installation of insulation and drywall.
04/22/2024 COT - RSBU - Interior Shear Bracing Passed
06/14/2024 COT - BULD - SWG Clearance Passed
06/18/2024 COT - RSEL - Electrical Final Passed
06/18/2024 COT - RSEL - Electrical Underground Passed
06/18/2024 COT - RSEL - Outdoor Lighting Passed
06/18/2024 COT - RSME - Mechanical Final Passed
06/18/2024 RSBU - Building Progress Passed
06/20/2024 COT - RSPL - Plumbing Final Passed
06/20/2024 RSBU - Building Final Passed
06/20/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
PT REPORT LOT 68 -2024-02-08_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CBT 68 PLOT PLAN FOR PERMIT_V1.PDF DOCUMENTS VIEW
CBT 68 PT CERT-2023-10-31_V1.PDF DOCUMENTS VIEW