Permit: TC-MDP-0723-01251
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
3065 E MISSOURI ST
Address NEW:
3065 E MISSOURI ST
Apply Date:
07/28/2023
Applicant:
Inai Maldonado
Description:
LUMO III New SFR
Permit Reviews
Permit Number - TC-MDP-0723-01251
Permit Status: Complete
Permit Description: LUMO III New SFR
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/28/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 07/31/2023 | REQUIRES RESUBMIT |
| 08/14/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 08/15/2023 | APPROVED |
| 09/22/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/22/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0723-01251
Permit Status: Complete
Permit Description: LUMO III New SFR
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 08/24/2023 | Associated Conditions DS0920 Septic shall have 100 ft setback to wells, 5 ft setback from property line, 50 ft setback from property line if no central water source, and 50 ft setback to washes that drains more than 20 acres. Applied | Notice | 06/23/2022 DS0945 Approval has been granted solely for a Construction Authorization and/or a Discharge Authorization in accordance with A.A.C. § R18-9-A301. Construction or discharging without local regulatory approval from Development Services in regard to zoning, grading, flood control and other applicable regulatory requirements may result in a violation of local ordinances and subject the applicant to penalties of up to $10,000.00 per instance per day. Applied | Notice | 06/23/2022 DS0950 Discharge authorization is required prior to building final inspection or certificate of occupancy. Applied | Notice | 06/23/2022 |
Conditions
Permit Number - TC-MDP-0723-01251
Permit Status: Complete
Permit Description: LUMO III New SFR
| Date | Description | Comments |
|---|---|---|
| 07/31/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. | |
| 05/01/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0723-01251
Permite Description: LUMO III New SFR
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/25/2023 | COT - RSBU - Interior Shear Bracing | N/A | Not Applicable | Not required for this project. No interior shear walls on approved drawings. |
| 09/28/2023 | RSPL - Plumbing Progress | N/A | Not Applicable | |
| 09/28/2023 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 09/28/2023 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 09/28/2023 | RSBU - Building Progress | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0723-01251
Permit Description: LUMO III New SFR
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/25/2023 | COT - RSEL - Electrical Underground | Passed | ||
| 08/25/2023 | COT - RSPL - Rough Soil | Passed | under ground plumbing pass. okay to backfill. shading required. 8/25/2023 | |
| 08/29/2023 | COT - RSPL - Sewer | Passed | ||
| 08/29/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 08/29/2023 | COT - RSBU - Preslab | Passed | ||
| 08/29/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
| 09/25/2023 | BULD - Electrical Clearance | Passed | Electrical panel with meter box are installed on side of house. Electrical rough-in is complete. Okay to energize panel. | |
| 09/25/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Roof decking is properly nailed off. Exterior sheathing is properly nailed off. H2.5 clips are installed on all roof rafters. | |
| 09/25/2023 | COT - RSBU - Roof Nailing | Passed | Roof decking is properly nailed off. Exterior sheathing is properly nailed off. H2.5 clips are installed on all roof rafters. | |
| 09/28/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 09/28/2023 | COT - RSPL - Yard Water Line | Passed |