Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
07/14/2023
Applicant:
Description:
1362 Corazon Del Pueblo

Permit Reviews

Permit Number - TC-MDP-0723-01245
Permit Status: Issued
Permit Description: 1362 Corazon Del Pueblo
Start Date Submittal Complete Date Status  
08/04/2023 RESTAMP - RESIDENTIAL v.1 08/07/2023 APPROVED Review Details
11/02/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/05/2023 APPROVED Review Details
10/26/2023 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/30/2023 APPROVED Review Details
07/14/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.1 07/18/2023 REQUIRES RESUBMIT Review Details
08/03/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.2 08/04/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0723-01245
Permit Status: Issued
Permit Description: 1362 Corazon Del Pueblo
Total Outstanding Activity Conditions - 1
Date Name
05/01/2023 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0723-01245
Permit Status: Issued
Permit Description: 1362 Corazon Del Pueblo
Date Description Comments
07/07/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/01/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0723-01245
Permit Description: 1362 Corazon Del Pueblo
Total Completed Inspections - 18
Date Description Inspector Results Comments
10/05/2023 COT - RSPL - Rough Soil Passed
10/05/2023 COT - RSPL - Sewer Passed
10/05/2023 COT - RSPL - Yard Water Line Passed
10/13/2023 COT - RSEL - Electrical Underground Passed
10/13/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
10/13/2023 COT - RSBU - Preslab Passed
10/13/2023 COT - RSEL - Grounding/Bonding Passed
02/23/2024 BULD - Electrical Clearance Passed
02/23/2024 COT - RSBU - Roof Nailing Passed
03/07/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
04/16/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/29/2024 COT - RSBU - Interior Shear Bracing Passed
06/14/2024 RSBU - Building Final Passed
06/14/2024 COT - RSEL - Outdoor Lighting Passed
06/14/2024 COT - RSEL - Electrical Final Passed
06/14/2024 COT - RSME - Mechanical Final Passed
06/14/2024 COT - RSPL - Plumbing Final Passed
06/14/2024 ENGR Engineering Final Passed Common Area/Easement needs additional work prior to closing out this subdivision

Documents

File Name Document Type  
MODEL 1362 ELEV. B LAYOUT_V1.PDF DOCUMENTS VIEW
MODEL 1362 ROOF TRUSSES CALCS STAMPED_V1.PDF DOCUMENTS VIEW
MODEL 1362 TOP ROOF LAYOUT_V1.PDF DOCUMENTS VIEW
MODEL 1362 ELEV. B FLOOR - LOWER ROOF (STAMPED)[15667]_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
HABITAT MODEL 1362 5740 E. VUELTA DE LADRILLO AMARILLO PLOT PLAN 165 7.25.23_V2.PDF DOCUMENTS VIEW
GC LETTER FOR COT_V1.PDF DOCUMENTS VIEW