Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
07/10/2023
Applicant:
David Martin
Description:
SFR K35W T21-M0037

Permit Reviews

Permit Number - TC-MDP-0723-01238
Permit Status: Complete
Permit Description: SFR K35W T21-M0037
Start Date Submittal Complete Date Status  
07/10/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 07/12/2023 APPROVED Review Details
02/14/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/15/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0723-01238
Permit Status: Complete
Permit Description: SFR K35W T21-M0037
Date Description Comments
07/10/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/10/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/15/2024 Post-Tension Inspection Report is required.
06/15/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/15/2023 Sewer condition must be accepted and released by Pima County
07/11/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0723-01238
Permite Description: SFR K35W T21-M0037
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
02/05/2024 ENGR Engineering Final N/A Partial Pass

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0723-01238
Permit Description: SFR K35W T21-M0037
Total Completed Inspections - 21
Date Description Inspector Results Comments
08/10/2023 COT - RSPL - Rough Soil Passed Approved. Okay to backfill. Shading required. 8/10/2023
08/10/2023 COT - RSPL - Sewer Passed Approved. Okay to backfill. Shading required. 8/10/2023
08/10/2023 COT - RSPL - Yard Water Line Passed Approved. Okay to backfill. Shading required. 8/10/2023
08/17/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
08/17/2023 COT - RSBU - Preslab Passed
08/17/2023 COT - RSEL - Electrical Underground Passed
08/17/2023 COT - RSEL - Grounding/Bonding Passed
09/21/2023 COT - RSBU - Exterior Clips/Sheathing Passed
09/21/2023 COT - RSBU - Roof Nailing Passed
11/01/2023 BULD - Electrical Clearance Passed ECO
12/13/23 clearance resent
11/01/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/20/2023 COT - RSPL - Gas Pressure Test Passed
11/21/2023 COT - RSBU - Interior Shear Bracing Passed
01/17/2024 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 1/17/2024
02/05/2024 COT - RSEL - Electrical Final Passed
02/05/2024 COT - RSEL - Outdoor Lighting Passed
02/05/2024 COT - RSME - Mechanical Final Passed
02/05/2024 COT - RSPL - Plumbing Final Passed
02/05/2024 RSBU - Building Final Passed
02/05/2024 RSBU - Building Progress Passed
02/09/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
210841 WESTBRIDGE AT SILVERBELL PT REPORT LOT 81-2024-02-14_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2023-07-10_V1.PDF DOCUMENTS VIEW