Permit: TC-MDP-0723-01237
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
2801 E ARROYO CHICO UNIT 2
Address NEW:
2801 E ARROYO CHICO UNIT 2
Apply Date:
07/10/2023
Applicant:
Eric Touhey
Description:
Sleeping Quarters
Permit Reviews
Permit Number - TC-MDP-0723-01237
Permit Status: Complete
Permit Description: Sleeping Quarters
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/24/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/08/2023 | APPROVED |
| 07/21/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 07/21/2023 | APPROVED |
| 07/21/2023 | RESTAMP - RESIDENTIAL v.1 | 07/24/2023 | APPROVED |
| 07/12/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 07/13/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0723-01237
Permit Status: Complete
Permit Description: Sleeping Quarters
| Date | Description | Comments |
|---|---|---|
| 07/12/2023 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 07/24/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit.pdf, is required prior to issuance of permit. | |
| 08/31/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0723-01237
Permite Description: Sleeping Quarters
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/19/2023 | COT - RSPL - Rough Soil | N/A | Re-inspection required | Provide approved plans. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0723-01237
Permit Description: Sleeping Quarters
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/20/2023 | COT - RSPL - Rough Soil | Passed | 10/20/23: Underground plumbing pipes have been exposed, washer drain line has been relocated, all incorrect pipe sizes have been replaced with the correct pipe size. Okay to shade pipes and backfill trenches. | |
| 10/20/2023 | COT - RSPL - Yard Water Line | Passed | Main water line is connected to house main water supply line. Okay to shade water line and backfill trench. | |
| 11/01/2023 | COT - RSBU - Preslab | Passed | 11-1-23: Pre-slab is properly compacted, rebar reinforcement is in place, sewer pipes running through foundation are properly wrapped with foam insulation. Okay to pour concrete for footings and slab. | |
| 11/13/2023 | COT - RSEL - Electrical Underground | Passed | 11/13/23: electrical underground for ADU and Studio per plan ok to backfill. | |
| 11/21/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 11/21/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 11/21/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 03/04/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 04/25/2024 | BULD - Electrical Clearance | Passed | ||
| 07/03/2024 | RSBU - Building Final | Passed | ||
| 07/09/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 07/09/2024 | COT - RSEL - Electrical Final | Passed | ||
| 07/09/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 07/09/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
| 07/09/2024 | COT - RSME - Mechanical Final | Passed | ||
| 07/09/2024 | COT - RSPL - Plumbing Final | Passed | ||
| 07/09/2024 | RSBU - Building Progress | Passed | ||
| 07/24/2024 | ENGR Engineering Final | Passed | All items installed per plan |