Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
120 E 25TH ST
Address NEW:
120 E 25TH ST
Apply Date:
09/18/2023
Applicant:
Ramon VALDEZ
Description:
DUPLEX DUPLVAL82 T22-M0037

Permit Reviews

Permit Number - TC-MDP-0723-01231
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Start Date Submittal Complete Date Status  
09/28/2023 RESTAMP - RESIDENTIAL v.1 10/02/2023 APPROVED Review Details
09/19/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.1 09/25/2023 REQUIRES RESUBMIT Review Details
09/27/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.2 09/28/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0723-01231
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Total Outstanding Activity Conditions - 1
Date Name
09/21/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0723-01231
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Date Description Comments
07/05/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0723-01231
Permite Description: DUPLEX DUPLVAL82 T22-M0037
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/23/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Partial Pass Ok to cover exterior walls.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0723-01231
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Total Completed Inspections - 19
Date Description Inspector Results Comments
10/06/2023 COT - RSPL - Rough Soil Passed Okay to backfill. Shading is required. 10/6/2023
10/06/2023 COT - RSPL - Sewer Passed Okay to backfill. Shading is required. 10/6/2023
10/09/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
10/09/2023 COT - RSBU - Preslab Passed Ensure slab area is properly termite treated. Ok to place concrete in progress areas.
10/09/2023 COT - RSEL - Grounding/Bonding Passed
10/23/2023 COT - RSBU - Roof Nailing Passed Ok to dry in roof system. Interior demising wall (1 hour rated)
10/26/2023 BULD - Electrical Clearance Passed TEP ECO
10/26/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
10/27/2023 COT - RSPL - Yard Water Line Passed
12/29/2023 COT - RSBU - Interior Shear Bracing Passed
12/29/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
12/29/2023 COT - RSEL - Electrical Final Passed
12/29/2023 COT - RSEL - Electrical Underground Passed
12/29/2023 COT - RSEL - Outdoor Lighting Passed
12/29/2023 COT - RSME - Mechanical Final Passed
12/29/2023 COT - RSPL - Plumbing Final Passed
12/29/2023 RSBU - Building Final Passed
12/29/2023 RSBU - Building Progress Passed
12/29/2023 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
120 25TH CORRECTIONS _V1.PDF DOCUMENTS VIEW