Permit: TC-MDP-0626-00394
Permit Details
Apply Date:
06/09/2026
Applicant:
Celina Rodriguez
Description:
Bella Tierra IV 2013 Plan (Model Master Plan TC-MDP-1225-00778)
Permit Reviews
Permit Number - TC-MDP-0626-00394
Permit Status: Inspections
Permit Description: Bella Tierra IV 2013 Plan (Model Master Plan TC-MDP-1225-00778)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/11/2026 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 06/22/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0626-00394
Permit Status: Inspections
Permit Description: Bella Tierra IV 2013 Plan (Model Master Plan TC-MDP-1225-00778)
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 06/05/2026 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. |
| 06/05/2026 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 06/16/2026 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 06/16/2026 | Post-Installed Anchor Inspection Report is required. |
| 06/16/2026 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. |
| 06/16/2026 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0626-00394
Permit Status: Inspections
Permit Description: Bella Tierra IV 2013 Plan (Model Master Plan TC-MDP-1225-00778)
| Date | Description | Comments |
|---|---|---|
| 06/05/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 06/05/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0626-00394
Permite Description: Bella Tierra IV 2013 Plan (Model Master Plan TC-MDP-1225-00778)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2026 | COT - RSPL - Sewer | N/A | Partial Pass | Partial pass, ok to backfill, with check connection when made |
| 07/15/2026 | COT - RSPL - Yard Water Line | N/A | Partial Pass | Partial pass, ok to backfill, with check pressure once meter is installed |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0626-00394
Permit Description: Bella Tierra IV 2013 Plan (Model Master Plan TC-MDP-1225-00778)
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2026 | COT - RSPL - Rough Soil | Passed | Passed | |
| 07/23/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed | |
| 07/23/2026 | COT - RSBU - Preslab | Passed | Passed | |
| 07/23/2026 | COT - RSEL - Electrical Underground | Passed | Passed | |
| 07/31/2026 | COT - RSBU - Roof Nailing | Passed | ||
| 07/31/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 08/11/2026 | BULD - Electrical Clearance | Passed | Passed CLEARANCE ECO | |
| 08/13/2026 | COT - RSPL - Gas Pressure Test | Passed | 8-13-26: approved. | |
| 08/17/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 08/28/2026 | COT - RSBU - Interior Shear Bracing | Passed |