Permit: TC-MDP-0625-00370
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
2133 E SUPERSONIC ST
Address NEW:
2133 E SUPERSONIC ST
Apply Date:
05/14/2026
Applicant:
Description:
Cielo Reserve 1465 SFR (Model master plan TC-MDP-0525-00294)
Permit Reviews
Permit Number - TC-MDP-0625-00370
Permit Status: Inspections complete
Permit Description: Cielo Reserve 1465 SFR (Model master plan TC-MDP-0525-00294)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/10/2026 | SPECIAL INSPECTION REVIEW v.1 | 09/10/2026 | APPROVED |
| 05/21/2026 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 06/01/2026 | APPROVED |
Conditions
Permit Number - TC-MDP-0625-00370
Permit Status: Inspections complete
Permit Description: Cielo Reserve 1465 SFR (Model master plan TC-MDP-0525-00294)
| Date | Description | Comments |
|---|---|---|
| 06/01/2026 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 06/23/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 06/23/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 06/01/2026 | Post-Installed Anchor Inspection Report is required. | |
| 06/23/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 06/23/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0625-00370
Permite Description: Cielo Reserve 1465 SFR (Model master plan TC-MDP-0525-00294)
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/14/2026 | ENGR Engineering Final | N/A | Re-inspection required | Remove Cane stakes from tree. Sidewalk in front of house not complete. The condenser unit pad is too low. Should be 3" clear from grade. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0625-00370
Permit Description: Cielo Reserve 1465 SFR (Model master plan TC-MDP-0525-00294)
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/04/2026 | COT - RSPL - Rough Soil | Passed | ||
| 06/04/2026 | COT - RSPL - Sewer | Passed | ||
| 06/04/2026 | COT - RSPL - Yard Water Line | Passed | ||
| 06/04/2026 | COT - RSPL - Backwater Valve | Passed | ||
| 06/10/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 6.10.26 Approved |
|
| 06/10/2026 | COT - RSBU - Preslab | Passed | ||
| 06/10/2026 | COT - RSEL - Electrical Underground | Passed | 6.10.26 Approved |
|
| 06/18/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 06/18/2026 | COT - RSBU - Roof Nailing | Passed | ||
| 07/07/2026 | COT - RSPL - Gas Pressure Test | Passed | ||
| 07/08/2026 | BULD - Electrical Clearance | Passed | 07/08/2026 Clearance TEP ECO. |
|
| 07/08/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 07/08/2026 Walked rest of electrical, all corrections made to prior notes. |
|
| 07/08/2026 | RSBU - Building Progress | Passed | ||
| 07/16/2026 | COT - RSBU - Interior Shear Bracing | Passed | 7-16-26: interior shear bracing approved-okay for tape & texture. | |
| 08/28/2026 | COT - BULD - SWG Clearance | Passed | 8-28-26 SWG Clearance approved | |
| 09/14/2026 | COT - RSEL - Grounding/Bonding | Passed | ||
| 09/14/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 09/14/2026 | COT - RSPL - Plumbing Final | Passed | 9-14-26 plumbing final approved | |
| 09/16/2026 | COT - RSEL - Electrical Final | Passed | 9-16-26 all items have been corrected electrical final approved | |
| 09/16/2026 | COT - RSME - Mechanical Final | Passed | 9-16-26 all items have been corrected mechanical final approved | |
| 09/18/2026 | ENGR Engineering Final | Passed | ||
| 09/18/2026 | RSBU - Building Final | Passed | 9-18-26 building final approved |