Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
6249 S SPRUCE GOOSE AV
Apply Date:
12/10/2025
Applicant:
Description:
Cielo Reserve 1465 SFR (Model master plan TC-MDP-0525-00294)

Permit Reviews

Permit Number - TC-MDP-0625-00364
Permit Status: Inspections complete
Permit Description: Cielo Reserve 1465 SFR (Model master plan TC-MDP-0525-00294)
Start Date Submittal Complete Date Status  
12/10/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 12/18/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0625-00364
Permit Status: Inspections complete
Permit Description: Cielo Reserve 1465 SFR (Model master plan TC-MDP-0525-00294)
Total Outstanding Activity Conditions - 4
Date Name
06/23/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/23/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
12/17/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
12/17/2025 Post-Installed Anchor Inspection Report is required.

Conditions

Permit Number - TC-MDP-0625-00364
Permit Status: Inspections complete
Permit Description: Cielo Reserve 1465 SFR (Model master plan TC-MDP-0525-00294)
Date Description Comments
06/23/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
06/23/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0625-00364
Permit Description: Cielo Reserve 1465 SFR (Model master plan TC-MDP-0525-00294)
Total Completed Inspections - 22
Date Description Inspector Results Comments
12/23/2025 COT - RSPL - Backwater Valve Passed 12.23.25
BWV verified
12/23/2025 COT - RSPL - Rough Soil Passed 12.23.25
Approved, ok to backfill
12/23/2025 COT - RSPL - Yard Water Line Passed 12.23.25
Blue tracer present and air test verified. Ok to backfill
12/23/2025 COT - RSPL - Sewer Passed 12.23.25
Tracer, connection and pipe verified. Proceed
01/09/2026 COT - RSBU - Preslab Passed 01/09/2026
Approved per site plan setbacks. Verified added STHD10 holdowns at shear walls, raised UFER at least 3" from ground trench, cleaned trench footings. Okay for concrete placement.
01/09/2026 COT - RSEL - Electrical Underground Passed
01/09/2026 COT - RSBU - Excavation/Rebar/Zoning Passed 01/09/2026
Approved per site plan setbacks. Verified added STHD10 holdowns at shear walls, raised UFER at least 3" from ground trench, cleaned trench footings. Okay for concrete placement.
01/20/2026 COT - RSBU - Roof Nailing Passed
01/22/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 1.22.26
Corrections made, approved
01/29/2026 BULD - Electrical Clearance Passed 01/29/2026
Clearance TEP ECO.
01/29/2026 COT - RSEL - Grounding/Bonding Passed 01/29/2026
Ufer tied into MSP.
02/02/2026 COT - RSPL - Gas Pressure Test Passed
02/02/2026 RSBU - Building Progress Passed
02/03/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 2.3.26
Approved
02/13/2026 COT - RSBU - Interior Shear Bracing Passed
03/23/2026 COT - BULD - SWG Clearance Passed 3.23.26
Approved for SWG clearance
03/27/2026 ENGR Engineering Final Passed
04/02/2026 COT - RSEL - Electrical Final Passed 4.2.26
Approved
04/02/2026 COT - RSEL - Outdoor Lighting Passed
04/02/2026 COT - RSME - Mechanical Final Passed
04/02/2026 COT - RSPL - Plumbing Final Passed 4.2.26
Approved
04/02/2026 RSBU - Building Final Passed 4.2.26
Approved

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
CIELO RESERVE - LOT 37 START_V1.PDF DOCUMENTS VIEW
CR 37 SIC-2025-12-09_V1.PDF DOCUMENTS VIEW