Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
6257 S SPRUCE GOOSE AV
Apply Date:
10/08/2025
Applicant:
Description:
Cielo Reserve 1465 SFR (Model master plan TC-MDP-0525-00294)

Permit Reviews

Permit Number - TC-MDP-0625-00362
Permit Status: Inspections complete
Permit Description: Cielo Reserve 1465 SFR (Model master plan TC-MDP-0525-00294)
Start Date Submittal Complete Date Status  
10/30/2025 RESTAMP - RESIDENTIAL v.1 10/31/2025 APPROVED Review Details
10/08/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 10/17/2025 REQUIRES RESUBMIT Review Details
10/24/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.2 10/30/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0625-00362
Permit Status: Inspections complete
Permit Description: Cielo Reserve 1465 SFR (Model master plan TC-MDP-0525-00294)
Total Outstanding Activity Conditions - 4
Date Name
06/23/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/23/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
10/09/2025 Post-Installed Anchor Inspection Report is required.
10/09/2025 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.

Conditions

Permit Number - TC-MDP-0625-00362
Permit Status: Inspections complete
Permit Description: Cielo Reserve 1465 SFR (Model master plan TC-MDP-0525-00294)
Date Description Comments
06/23/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
06/23/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0625-00362
Permite Description: Cielo Reserve 1465 SFR (Model master plan TC-MDP-0525-00294)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/14/2025 COT - RSEL - Electrical Underground N/A Partial Pass 11-14-25: partial pass for UFER only.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0625-00362
Permit Description: Cielo Reserve 1465 SFR (Model master plan TC-MDP-0525-00294)
Total Completed Inspections - 22
Date Description Inspector Results Comments
11/06/2025 COT - RSPL - Yard Water Line Passed 11-6-25: min water line verified under test. Okay to backfill,using shading materials.
11/07/2025 COT - RSPL - Backwater Valve Passed 11-7-25: backwater valve approved. Okay to backfill with shading materials.
11/07/2025 COT - RSPL - Rough Soil Passed 11-7-25: underground plumbing verified per plans. Okay to backfill with shading materials.
11/14/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 11-14-25: excavation/reinforcement, preslab approved. Okay for concrete placement.
11/14/2025 COT - RSBU - Preslab Passed 11-14-25: excavation/reinforcement, preslab approved. Okay for concrete placement.
11/20/2025 COT - RSBU - Roof Nailing Passed 11.20.2025
Approved per truss calcs, added nails to garage roof panel.
11/20/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
12/01/2025 BULD - Electrical Clearance Passed Clearance for TEP ECO. 12/1/2025
12/15/2025 COT - RSPL - Gas Pressure Test Passed 12-15-25: gas pressure test verified at 15 psi.
12/15/2025 RSBU - Building Progress Passed 12-15-25: approved.
12/17/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12/17/2025
Approved. Verified the electrician-supplied panel schedule with circuit layout.
12/22/2025 COT - RSPL - Sewer Passed 12-22-25: HCS verified under test and per plans-okay to backfill with shading materials.
12/23/2025 COT - RSBU - Interior Shear Bracing Passed 12.23.25
Fastener schedule verified.
02/02/2026 COT - BULD - SWG Clearance Passed Clearance to Southwest Gas. 2/1/2026
02/10/2026 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
02/17/2026 COT - RSEL - Electrical Final Passed 2-17-26: electrical final approved.
02/17/2026 COT - RSEL - Electrical Underground Passed 2-17-26: approved.
02/17/2026 COT - RSEL - Grounding/Bonding Passed 2-17-26: approved.
02/17/2026 COT - RSEL - Outdoor Lighting Passed 2-17-26: outdoor lighting approved.
02/18/2026 COT - RSME - Mechanical Final Passed 2.18.26
Corrections made, approved
02/18/2026 COT - RSPL - Plumbing Final Passed 2.18.26
Corrections made, approved
02/18/2026 RSBU - Building Final Passed 2.18.26
Corrections made, approved

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CIELO RESERVE - LOT 38 START_V2.PDF DOCUMENTS VIEW
050 -CR LOT 38 TC-MDP-0625-00362_V1.PDF DOCUMENTS VIEW
CR 38 SIC-2025-10-08_V1.PDF DOCUMENTS VIEW