Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Model Building Permit
Address:
9565 E MEOLA DR
Address NEW:
9565 E MEOLA DR
Apply Date:
12/18/2025
Applicant:
Celina Rodriguez
Description:
KB Home 2467 (Model master plan TC-MDP-1124-01304)

Permit Reviews

Permit Number - TC-MDP-0625-00356
Permit Status: Inspections
Permit Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Start Date Submittal Complete Date Status  
12/19/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/30/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0625-00356
Permit Status: Inspections
Permit Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Total Outstanding Activity Conditions - 5
Date Name
06/18/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/18/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
12/22/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/22/2025 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
12/22/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Conditions

Permit Number - TC-MDP-0625-00356
Permit Status: Inspections
Permit Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Date Description Comments
06/18/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
06/18/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0625-00356
Permite Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
01/14/2026 COT - RSEL - Grounding/Bonding N/A Partial Pass 01/14/2026
Ufer only, partial pending tie in.
01/26/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Partial Pass Partial pass, corrections to be checked at intermediate. Missing anchor bolt with washer plate at back door, washer plates at garage shear walls. Marked masa clip in great room missing nails, sister damaged stud in upstairs master bathroom

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0625-00356
Permit Description: KB Home 2467 (Model master plan TC-MDP-1124-01304)
Total Completed Inspections - 9
Date Description Inspector Results Comments
01/06/2026 COT - RSPL - Yard Water Line Passed 01/06/2026
Holding under test with blue tracer to riser. Okay to backfill with shading materials.
01/06/2026 COT - RSPL - Sewer Passed 01/06/2026
Holding under test with green tracer to HCS. Okay to backfill with shading materials.
01/06/2026 COT - RSPL - Rough Soil Passed 01/06/2026
All fixtures present and holding under test in clean trench and slope. Okay to backfill with shading materials.
01/06/2026 COT - RSPL - Backwater Valve Passed 01/06/2026
Backwater valve in place.
01/14/2026 COT - RSBU - Excavation/Rebar/Zoning Passed 01/14/2026
Approved per site plan and setbacks.
01/14/2026 COT - RSBU - Preslab Passed 01/14/2026
Approved per plan, okay for concrete placement.
01/14/2026 COT - RSEL - Electrical Underground Passed
01/26/2026 COT - RSBU - Roof Nailing Passed Passed 1/26/26
01/28/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Corrections were made. 1/28/2026

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
MIRADOR POINT - LOT 149 START_V1.PDF DOCUMENTS VIEW
MP 149 SIC-2025-12-18_V1.PDF DOCUMENTS VIEW