Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
1518 E 27TH ST UNIT 1
Apply Date:
08/15/2025
Applicant:
Description:
Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)

Permit Reviews

Permit Number - TC-MDP-0625-00340
Permit Status: Complete
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Start Date Submittal Complete Date Status  
10/08/2025 ADMINISTRATIVE v.1 10/08/2025 REQUIRES RESUBMIT Review Details
10/13/2025 ADMINISTRATIVE v.2 10/13/2025 APPROVED Review Details
09/12/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 10/06/2025 APPROVED Review Details
10/06/2025 RESTAMP - RESIDENTIAL v.1 10/08/2025 APPROVED Review Details
08/18/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 09/05/2025 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-0625-00340
Permit Status: Complete
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Date Description Comments
10/08/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
06/16/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
06/16/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
09/02/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0625-00340
Permite Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
10/17/2025 COT - RSPL - Rough Soil N/A Partial Pass 10-17-25: underground plumbing verified per plans & under test. Okay to backfill with shading materials.
Note: Greywater will be inspected at intermediates.
02/09/2026 COT - BULD - SWG Clearance N/A Not Applicable
02/09/2026 COT - RSPL - Gas Pressure Test N/A Not Applicable
02/09/2026 ENGR Engineering Final N/A Not Ready 2/9/26
No PAG 200 sidewalk as shown on plan. No trees, plants and irrigation as shown on plans. (I could only find one meter).... No water harvesting basins as shown on plans.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0625-00340
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Completed Inspections - 19
Date Description Inspector Results Comments
10/17/2025 COT - RSPL - Sewer Passed 10-17-25: HCS connection approved-okay to backfill with shading materials
10/21/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 10/21/25 ok to pour concrete
10/21/2025 COT - RSBU - Preslab Passed Passed 10/21/25 ok to pour concrete
10/21/2025 COT - RSEL - Grounding/Bonding Passed Passed 10/21/25 ok to pour concrete
11/03/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
11/03/2025 COT - RSBU - Roof Nailing Passed
11/03/2025 COT - RSBU - Interior Shear Bracing Passed Fire wall approved. 11/3/2025
11/05/2025 BULD - Electrical Clearance Passed TEP CLEARANCE: ECO, UNIT 1 AND 2.
11/05/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/05/2025 COT - RSPL - Rough Soil Passed
02/09/2026 COT - RSEL - Electrical Final Passed
02/09/2026 COT - RSEL - Electrical Underground Passed 2.9.26
Approved
02/09/2026 COT - RSEL - Outdoor Lighting Passed 2.9.26
Approved
02/09/2026 COT - RSME - Mechanical Final Passed 2.9.26
Approved
02/09/2026 COT - RSPL - Plumbing Final Passed 2.9.26
Approved
02/09/2026 COT - RSPL - Yard Water Line Passed 2.9.26
Approved
02/09/2026 RSBU - Building Final Passed 2.9.26
Approved
02/09/2026 RSBU - Building Progress Passed 2.9.26
Approved
02/23/2026 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL (SSRS).PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1518 27 (1)_V2.PDF DOCUMENTS VIEW
27 WHOLE SITE_V2.PDF DOCUMENTS VIEW