Permit Details

Status:
Inspections
Type:
Model Building Permit
Address NEW:
6121 E CAMPOLINA TR
Apply Date:
06/12/2025
Applicant:
Chris Irby
Description:
Blackhawk T936 - Palm (Model master plan TC-MDP-0923-01494)

Permit Reviews

Permit Number - TC-MDP-0625-00337
Permit Status: Inspections
Permit Description: Blackhawk T936 - Palm (Model master plan TC-MDP-0923-01494)
Start Date Submittal Complete Date Status  
06/17/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 06/26/2025 APPROVED Review Details
08/28/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/02/2026 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0625-00337
Permit Status: Inspections
Permit Description: Blackhawk T936 - Palm (Model master plan TC-MDP-0923-01494)
Date Description Comments
06/20/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/17/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
06/20/2025 Post-Installed Anchor Inspection Report is required.
06/11/2025 Post-Tension Inspection Report is required.
06/11/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
06/11/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0625-00337
Permite Description: Blackhawk T936 - Palm (Model master plan TC-MDP-0923-01494)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
06/30/2026 COT - RSME - Mechanical Final N/A Re-inspection required 6-30-26: per previous notes from 6/29/26, a studor vent at kitchen island is required. Please reschedule and provide approved plans to verify whether the studor vent is required or a "Boston Loop" is allowed.
06/30/2026 RSBU - Building Final N/A Re-inspection required 6-30-26: per previous notes from 6/29/26, a studor vent at kitchen island is required. Please reschedule and provide approved plans to verify whether the studor vent is required or a "Boston Loop" is allowed.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0625-00337
Permit Description: Blackhawk T936 - Palm (Model master plan TC-MDP-0923-01494)
Total Completed Inspections - 22
Date Description Inspector Results Comments
03/25/2026 COT - RSPL - Backwater Valve Passed 3.25.26
Approved
03/25/2026 COT - RSPL - Rough Soil Passed 3.25.26
Approved
03/25/2026 COT - RSPL - Sewer Passed 3.25.26
Approved
03/25/2026 COT - RSPL - Yard Water Line Passed 3.25.26
Approved
04/01/2026 COT - RSBU - Excavation/Rebar/Zoning Passed 4.1.26
Approved
Ok to pour
04/01/2026 COT - RSBU - Preslab Passed
04/01/2026 COT - RSEL - Electrical Underground Passed
04/10/2026 COT - RSBU - Roof Nailing Passed 04/10/2026
Approved, verified truss calcs and nail schedule.
04/20/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 04/20/2026
Corrections made to prior inspection.
04/28/2026 COT - RSEL - Grounding/Bonding Passed
04/28/2026 COT - RSPL - Gas Pressure Test Passed
04/30/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 04/30/2026
Corrections made.
05/12/2026 BULD - Electrical Clearance Passed 05/12/2026
Approved clearance TEP ECO. This clearance passed on 4/28/26, contractor requested resubmit since not received by TEP.
05/15/2026 COT - RSBU - Interior Shear Bracing Passed
06/23/2026 COT - BULD - SWG Clearance Passed
06/29/2026 COT - RSEL - Outdoor Lighting Passed
06/29/2026 COT - RSPL - Plumbing Final Passed
06/29/2026 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
06/29/2026 RSBU - Building Progress Passed
06/30/2026 COT - RSEL - Electrical Final Passed 6-30-26: electrical final approved.
07/07/2026 COT - RSME - Mechanical Final Passed
07/07/2026 RSBU - Building Final Passed