Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
07/16/2024
Applicant:
Dana Petty
Description:
SFR MERI150293 T21-M0067 REV1 roof covering change

Permit Reviews

Permit Number - TC-MDP-0624-00763
Permit Status: Issued
Permit Description: SFR MERI150293 T21-M0067 REV1 roof covering change
Start Date Submittal Complete Date Status  
07/16/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 07/23/2024 APPROVED Review Details
10/03/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 10/07/2024 APPROVED Review Details
01/15/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/15/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0624-00763
Permit Status: Issued
Permit Description: SFR MERI150293 T21-M0067 REV1 roof covering change
Date Description Comments
07/22/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
07/22/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/15/2025 Post-Installed Anchor Inspection Report is required.
07/22/2024 Post-Tension Inspection Report is required.
06/28/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/28/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
07/22/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0624-00763
Permit Description: SFR MERI150293 T21-M0067 REV1 roof covering change
Total Completed Inspections - 13
Date Description Inspector Results Comments
11/12/2024 COT - RSPL - Yard Water Line Passed 11-12-24, main water line inspection approved. Okay to backfill.
11/12/2024 COT - RSPL - Sewer Passed 11-12-24, sewer connection inspection approved. Okay to backfill.
11/12/2024 COT - RSPL - Rough Soil Passed 11-12-24, underground plumbing inspection approved. Okay to backfill.
11/18/2024 COT - RSBU - Preslab Passed 11-18-24, preslab per approved plans. Okay to pour concrete.
11/18/2024 COT - RSEL - Electrical Underground Passed 11-18-24, preslab , electrical under ground,bonding, per approved plans. Okay to pour concrete.
11/18/2024 COT - RSEL - Grounding/Bonding Passed 11-18-24, preslab , electrical under ground,bonding, per approved plans. Okay to pour concrete.
12/05/2024 COT - RSBU - Exterior Clips/Sheathing Passed
12/05/2024 COT - RSBU - Roof Nailing Passed
01/09/2025 BULD - Electrical Clearance Passed 1-9-25, panel approved to be energized. ECO clearance issued to TEP.
01/09/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 1-9-25, setbacks verified. Rebar was checked at preslab inspection.
01/09/2025 COT - RSPL - Gas Pressure Test Passed 1-9-25, gas pressure test approved.
01/10/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 01/10/25
receptacle added.
01/23/2025 COT - RSBU - Interior Shear Bracing Passed 1-23-25, interior shear wall inspection approved. Okay to tape & texture drywall

Documents

File Name Document Type  
151699 PT LOT 90 COMPLETE-2025-01-07_V1.PDF DOCUMENTS VIEW
LOT 90 PLOT PLAN REV1_V1.PDF DOCUMENTS VIEW
TC-MDP-0624-00763 REVISION 10.3.24_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 90 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 90 SPECIAL INSPECTION CERTIFICATE-2024-07-16_V1.PDF DOCUMENTS VIEW