Permit: TC-MDP-0624-00761
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
10681 E ROSY MARBLE DR
Address NEW:
10681 E ROSY MARBLE DR
Apply Date:
07/11/2024
Applicant:
Dana Petty
Description:
SFR MERI150293 T21-M0067 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0624-00761
Permit Status: Complete
Permit Description: SFR MERI150293 T21-M0067 REV1 roof covering change
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/06/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/07/2025 | APPROVED |
| 07/12/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 07/17/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0624-00761
Permit Status: Complete
Permit Description: SFR MERI150293 T21-M0067 REV1 roof covering change
| Date | Description | Comments |
|---|---|---|
| 07/17/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 07/17/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 07/17/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 07/17/2024 | Post-Tension Inspection Report is required. | |
| 06/28/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 06/28/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 07/17/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0624-00761
Permite Description: SFR MERI150293 T21-M0067 REV1 roof covering change
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/01/2024 | COT - RSBU - Roof Nailing | N/A | Canceled | |
| 11/01/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Canceled |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0624-00761
Permit Description: SFR MERI150293 T21-M0067 REV1 roof covering change
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/15/2024 | COT - RSPL - Yard Water Line | Passed | Passed, read to backfill, shading required 10/15/24 | |
| 10/15/2024 | COT - RSPL - Backwater Valve | Passed | 10/15/24 pass | |
| 10/15/2024 | COT - RSPL - Rough Soil | Passed | 10/15/24 pass OK to backfill, shading required | |
| 10/15/2024 | COT - RSPL - Sewer | Passed | Per schedule with tracer wire 10/15/24 | |
| 10/21/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 10/21/2024 | COT - RSBU - Preslab | Passed | ||
| 10/21/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 11/05/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 12/11/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 12-11-24, verified nailing at trusses/load bearing interior walls per approved plans. Okay to proceed with construction. | |
| 12/11/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 12-11-24, residential intermediate inspection approved. Okay to continue construction. | |
| 12/11/2024 | COT - RSEL - Grounding/Bonding | Passed | 12-11-24, grounding/bonding approved. | |
| 12/11/2024 | COT - RSPL - Gas Pressure Test | Passed | 12-11-24, gas pressure test verified at 15psi. | |
| 12/12/2024 | BULD - Electrical Clearance | Passed | 12-12-24, panel okay to be energized. ECO clearance sent to TEP. | |
| 12/30/2024 | COT - RSBU - Interior Shear Bracing | Passed | 12-30-24, interior shear wall inspection approved. Okay to tape & texture drywall. | |
| 02/24/2025 | COT - BULD - SWG Clearance | Passed | Passed CLEARANCE SWG 2/24/25 | |
| 02/28/2025 | COT - RSEL - Electrical Final | Passed | Passed 2/28/25 CLEARANCE ECO | |
| 02/28/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 2/28/25 | |
| 02/28/2025 | COT - RSME - Mechanical Final | Passed | Passed final 2/28/25 | |
| 02/28/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 2/28/25 | |
| 02/28/2025 | RSBU - Building Final | Passed | Passed final 2/28/25 | |
| 02/28/2025 | RSBU - Building Progress | Passed | Passed final 2/28/25 | |
| 03/18/2025 | ENGR Engineering Final | Passed | Site is ready. Title transferred and residents living in house prior to inspection pass. |