Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
6757 E VIA DE AYATE
Apply Date:
07/08/2024
Applicant:
Craig Morczynski
Description:
SFR LENNLE4005 T22-M0049

Permit Reviews

Permit Number - TC-MDP-0624-00756
Permit Status: Inspections complete
Permit Description: SFR LENNLE4005 T22-M0049
Start Date Submittal Complete Date Status  
07/08/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 07/09/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0624-00756
Permit Status: Inspections complete
Permit Description: SFR LENNLE4005 T22-M0049
Total Outstanding Activity Conditions - 6
Date Name
06/27/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
07/09/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/09/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/09/2024 Post-Tension Inspection Report is required.
07/09/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
07/13/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0624-00756
Permit Status: Inspections complete
Permit Description: SFR LENNLE4005 T22-M0049
Date Description Comments
07/09/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
06/27/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/13/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/09/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0624-00756
Permit Description: SFR LENNLE4005 T22-M0049
Total Completed Inspections - 21
Date Description Inspector Results Comments
11/08/2024 COT - RSPL - Rough Soil Passed 11/8/24. PASSED
11/08/2024 COT - RSPL - Sewer Passed 11/8/24. PASSED
11/08/2024 COT - RSPL - Yard Water Line Passed 11/8/24. PASSED
11/14/2024 COT - RSBU - Preslab Passed 11-14-24, excavation, rebar, setbacks, and preslab verified as per approved plans. Okay for concrete placement.
11/14/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 11-14-24, excavation, rebar, setbacks, and preslab verified as per approved plans. Okay for concrete placement.
11/14/2024 COT - RSEL - Electrical Underground Passed 11-14-24, excavation, grounding,rebar, setbacks, and preslab verified as per approved plans. Okay for concrete placement.
11/14/2024 COT - RSEL - Grounding/Bonding Passed 11-14-24, excavation, grounding,rebar, setbacks, and preslab verified as per approved plans. Okay for concrete placement.
12/13/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Per plans 12/13/24
12/13/2024 COT - RSBU - Roof Nailing Passed Per plans 12/13/24
01/17/2025 BULD - Electrical Clearance Passed Ready for temp power CLEARANCE ECO 1/17/25
01/17/2025 COT - RSPL - Gas Pressure Test Passed Passed 1/17/25
01/17/2025 RSBU - Building Progress Passed passed 1/17/25
01/21/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 1-21-25, approved.okay to continue construction
01/29/2025 COT - RSBU - Interior Shear Bracing Passed 1/29/25 pass
03/25/2025 COT - BULD - SWG Clearance Passed Passed 3/25/25 CLEARANCE SWG
04/09/2025 ENGR Engineering Final Passed CO READY
04/09/2025 COT - RSEL - Electrical Final Passed 4-9-25, electrical final approved.
04/09/2025 COT - RSEL - Outdoor Lighting Passed 4-9-25, outdoor lighting approved.
04/09/2025 COT - RSME - Mechanical Final Passed 4-9-25, mechanical final approved.
04/17/2025 COT - RSPL - Plumbing Final Passed 4/17/25
Corrections made.
04/17/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LE II 4 PLOT_V1.PDF DOCUMENTS VIEW
LE II 4 SIC-2024-07-08_V1.PDF DOCUMENTS VIEW