Permit: TC-MDP-0624-00756
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
6757 E VIA DE AYATE
Address NEW:
6757 E VIA DE AYATE
Apply Date:
07/08/2024
Applicant:
Craig Morczynski
Description:
SFR LENNLE4005 T22-M0049
Permit Reviews
Permit Number - TC-MDP-0624-00756
Permit Status: Inspections complete
Permit Description: SFR LENNLE4005 T22-M0049
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/08/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 07/09/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0624-00756
Permit Status: Inspections complete
Permit Description: SFR LENNLE4005 T22-M0049
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 06/27/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 07/09/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 07/09/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 07/09/2024 | Post-Tension Inspection Report is required. |
| 07/09/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 07/13/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0624-00756
Permit Status: Inspections complete
Permit Description: SFR LENNLE4005 T22-M0049
| Date | Description | Comments |
|---|---|---|
| 07/09/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 06/27/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/13/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/09/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0624-00756
Permit Description: SFR LENNLE4005 T22-M0049
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/08/2024 | COT - RSPL - Rough Soil | Passed | 11/8/24. PASSED | |
| 11/08/2024 | COT - RSPL - Sewer | Passed | 11/8/24. PASSED | |
| 11/08/2024 | COT - RSPL - Yard Water Line | Passed | 11/8/24. PASSED | |
| 11/14/2024 | COT - RSBU - Preslab | Passed | 11-14-24, excavation, rebar, setbacks, and preslab verified as per approved plans. Okay for concrete placement. | |
| 11/14/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 11-14-24, excavation, rebar, setbacks, and preslab verified as per approved plans. Okay for concrete placement. | |
| 11/14/2024 | COT - RSEL - Electrical Underground | Passed | 11-14-24, excavation, grounding,rebar, setbacks, and preslab verified as per approved plans. Okay for concrete placement. | |
| 11/14/2024 | COT - RSEL - Grounding/Bonding | Passed | 11-14-24, excavation, grounding,rebar, setbacks, and preslab verified as per approved plans. Okay for concrete placement. | |
| 12/13/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Per plans 12/13/24 | |
| 12/13/2024 | COT - RSBU - Roof Nailing | Passed | Per plans 12/13/24 | |
| 01/17/2025 | BULD - Electrical Clearance | Passed | Ready for temp power CLEARANCE ECO 1/17/25 | |
| 01/17/2025 | COT - RSPL - Gas Pressure Test | Passed | Passed 1/17/25 | |
| 01/17/2025 | RSBU - Building Progress | Passed | passed 1/17/25 | |
| 01/21/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 1-21-25, approved.okay to continue construction | |
| 01/29/2025 | COT - RSBU - Interior Shear Bracing | Passed | 1/29/25 pass | |
| 03/25/2025 | COT - BULD - SWG Clearance | Passed | Passed 3/25/25 CLEARANCE SWG | |
| 04/09/2025 | ENGR Engineering Final | Passed | CO READY | |
| 04/09/2025 | COT - RSEL - Electrical Final | Passed | 4-9-25, electrical final approved. | |
| 04/09/2025 | COT - RSEL - Outdoor Lighting | Passed | 4-9-25, outdoor lighting approved. | |
| 04/09/2025 | COT - RSME - Mechanical Final | Passed | 4-9-25, mechanical final approved. | |
| 04/17/2025 | COT - RSPL - Plumbing Final | Passed | 4/17/25 Corrections made. |
|
| 04/17/2025 | RSBU - Building Final | Passed |