Permit: TC-MDP-0624-00753
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
3114 N ALVERNON WY UNIT 7
Address NEW:
3114 N ALVERNON WY UNIT 7
Apply Date:
07/01/2024
Applicant:
Marc Wolfe
Description:
SFR 2 Bedroom
Permit Reviews
Permit Number - TC-MDP-0624-00753
Permit Status: Inspections
Permit Description: SFR 2 Bedroom
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/05/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 07/29/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0624-00753
Permit Status: Inspections
Permit Description: SFR 2 Bedroom
| Date | Description | Comments |
|---|---|---|
| 06/27/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0624-00753
Permite Description: SFR 2 Bedroom
Total Outstanding Inspections - 11
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/06/2024 | COT - RSPL - Rough Soil | N/A | Not Ready | Not ready 5 foot head is required for underground inspection and arrange clean out and backflow so that backflow is under test as well |
| 12/19/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Not Ready | No access for inspection. |
| 08/04/2025 | COT - RSEL - Grounding/Bonding | N/A | Not Applicable | duplicate inspection |
| 08/20/2024 | COT - RSBU - Interior Shear Bracing | N/A | Not Ready | wanted roof deck inspection, but already approved. |
| 08/04/2025 | COT - RSPL - Yard Water Line | N/A | Not Applicable | duplicate inspection |
| 08/04/2025 | COT - RSEL - Electrical Underground | N/A | Not Applicable | no underground electric |
| 08/02/2024 | COT - RSPL - Sewer | N/A | Not Ready | Inspection completed on development permit. Customer wanted Underground Plumbing and Backwater Valve. |
| 08/04/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | site does not use gas |
| 08/04/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | site does not use gas |
| 08/04/2025 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Not Applicable | duplicate inspection |
| 08/06/2024 | COT - RSPL - Backwater Valve | N/A | Not Ready | Backwater valve not under test |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0624-00753
Permit Description: SFR 2 Bedroom
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/08/2024 | COT - RSBU - Preslab and floodplain | Passed | ||
| 08/13/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 08/13/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 12/06/2024 | BULD - Electrical Clearance | Passed | Grounding proper, temp receptacle and address tag present. CLEARANCE ECO 12/6/24 | |
| 12/20/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 08/04/2025 | COT - RSME - Mechanical Final | Passed | Passed 8/1/25 | |
| 08/04/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed 8/1/25 | |
| 08/04/2025 | COT - RSPL - Plumbing Final | Passed | Passed 8/1/25 | |
| 08/04/2025 | RSBU - Building Progress | Passed | Passed 8/1/25 | |
| 08/04/2025 | COT - RSEL - Electrical Final | Passed | Passed 8/1/25 | |
| 08/04/2025 | RSBU - Building Final | Passed | Passed 8/1/25 |