Permit: TC-MDP-0624-00747
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12899 E TORTOISE POINTE DR
Address NEW:
12899 E TORTOISE POINTE DR
Apply Date:
06/21/2024
Applicant:
Description:
SFR RKF55I T21-M0086
Permit Reviews
Permit Number - TC-MDP-0624-00747
Permit Status: Inspections complete
Permit Description: SFR RKF55I T21-M0086
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/31/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 11/19/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0624-00747
Permit Status: Inspections complete
Permit Description: SFR RKF55I T21-M0086
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 06/24/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 11/04/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 11/04/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 11/04/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 11/04/2024 | Post-Tension Inspection Report is required. |
| 11/04/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0624-00747
Permit Status: Inspections complete
Permit Description: SFR RKF55I T21-M0086
| Date | Description | Comments |
|---|---|---|
| 06/24/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0624-00747
Permit Description: SFR RKF55I T21-M0086
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/17/2024 | COT - RSPL - Backwater Valve | Passed | 12/17/24 OK to backfill, shading required | |
| 12/17/2024 | COT - RSPL - Rough Soil | Passed | 12/17/24 OK to backfill, shading required | |
| 12/17/2024 | COT - RSPL - Sewer | Passed | 12/17/24 OK to backfill, shading required | |
| 12/17/2024 | COT - RSPL - Yard Water Line | Passed | 12/17/24 OK to backfill, shading required | |
| 01/10/2025 | COT - RSBU - Preslab | Passed | Passed 1/10/25 ok to pour concrete | |
| 01/10/2025 | COT - RSEL - Electrical Underground | Passed | Passed 1/10/25 ok to proceed | |
| 01/10/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 1/10/25 ok to pour concrete | |
| 01/10/2025 | COT - RSEL - Grounding/Bonding | Passed | Passed 1/10/25 ok to proceed | |
| 01/28/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 12/28/25 pass | |
| 01/28/2025 | COT - RSBU - Roof Nailing | Passed | 12/28/25 pass | |
| 02/25/2025 | BULD - Electrical Clearance | Passed | ||
| 02/25/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 02/26/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 26 FEB 25 1. Pass |
|
| 03/17/2025 | COT - RSBU - Interior Shear Bracing | Passed | 3-17-25, interior shear bracing inspection approved. Okay for tape & texture. | |
| 04/24/2025 | COT - BULD - SWG Clearance | Passed | Passed CLEARANCE SWG 4/24/25 | |
| 05/06/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 05/06/2025 | COT - RSME - Mechanical Final | Passed | ||
| 05/06/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 05/06/2025 | ENGR Engineering Final | Passed | I was told portopotty at property line would be removed later today by B Kampel. | |
| 05/06/2025 | RSBU - Building Progress | Passed | ||
| 05/07/2025 | COT - RSEL - Electrical Final | Passed | 5/7/25 Corrections made | |
| 05/07/2025 | RSBU - Building Final | Passed | Passed 5/7/25 corrections made |