Permit: TC-MDP-0624-00741
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12758 E MEAGAN RIDGE PL
Address NEW:
12758 E MEAGAN RIDGE PL
Apply Date:
07/18/2024
Applicant:
Brandon Kempel
Description:
SFR RKM45R T21-M0093 (REVISION Delta 4)
Permit Reviews
Permit Number - TC-MDP-0624-00741
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/22/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 07/30/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0624-00741
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 06/24/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 07/30/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 07/30/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 07/30/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 07/30/2024 | Post-Tension Inspection Report is required. |
| 07/30/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0624-00741
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
| Date | Description | Comments |
|---|---|---|
| 06/24/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/30/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0624-00741
Permite Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2024 | COT - RSPL - Gas Pressure Test | N/A | Re-inspection required | 11-13-24, pancake box overfilled at garage exterior lights. Box is rated for 6 cubic inches and contains 2 14/2 awg wires. Also, gas gauge at 7 psi and electrical panel not ready for temp power. |
| 11/13/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 11-13-24, pancake box overfilled at garage exterior lights. Box is rated for 6 cubic inches and contains 2 14/2 awg wires. Also, gas gauge at 7 psi and electrical panel not ready for temp power. |
| 11/20/2024 | COT - BULD - SWG Clearance | N/A | Not Ready | 11-20-24, not ready for gas connection l |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0624-00741
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/09/2024 | COT - RSPL - Yard Water Line | Passed | 9/9/24: Main water line is connected to city meter and under street pressure with no leaks. Okay to shade pipe and backfill trench. | |
| 09/09/2024 | COT - RSPL - Sewer | Passed | 9/9/24: Underground plumbing is installed and connected to main sewer system with green tracer wire in place, entire system under water test. Okay to shade pipes and backfill trenches. | |
| 09/09/2024 | COT - RSPL - Rough Soil | Passed | 9/9/24: Underground plumbing is installed and connected to main sewer system with green tracer wire in place, entire system under water test. Okay to shade pipes and backfill trenches. | |
| 09/16/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 09/17/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 9/17/2024. Okay for concrete placement. | |
| 09/17/2024 | COT - RSBU - Preslab | Passed | 9/17/2024. Okay for concrete placement. | |
| 09/17/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/07/2024 | COT - RSBU - Roof Nailing | Passed | Okay to proceed with rough-in. | |
| 10/07/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Okay to proceed with rough-in. | |
| 11/19/2024 | COT - RSPL - Gas Pressure Test | Passed | 11-19-24, verified gas pressure test at 15 psi | |
| 11/22/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 11-22-24, residential intermediate approved. Okay to continue with construction. | |
| 11/29/2024 | BULD - Electrical Clearance | Passed | 11-29-24, panel approved to be energized (ECO). | |
| 12/10/2024 | COT - RSBU - Interior Shear Bracing | Passed | 12-10-24, interior shear bracing verified as per approved plans prior. Okay to tape & texture drywall. | |
| 02/06/2025 | COT - BULD - SWG Clearance | Passed | 2/6/25 passed SWG CLEARANCE | |
| 02/12/2025 | COT - RSEL - Electrical Final | Passed | Passed final 2/12/25 CLEARANCE ECO | |
| 02/12/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 2/12/25 | |
| 02/12/2025 | COT - RSME - Mechanical Final | Passed | Passed final 2/12/25 | |
| 02/12/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 2/12/25 | |
| 02/11/2025 | ENGR Engineering Final | Passed | ||
| 02/12/2025 | RSBU - Building Final | Passed | Passed final 2/12/25 | |
| 02/12/2025 | RSBU - Building Progress | Passed | Passed final 2/12/25 |