Permit: TC-MDP-0624-00736
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
12885 E TORTOISE POINTE DR
Address NEW:
12885 E TORTOISE POINTE DR
Apply Date:
07/01/2024
Applicant:
Brandon Kempel
Description:
SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Permit Reviews
Permit Number - TC-MDP-0624-00736
Permit Status: Inspections
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/01/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 07/02/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0624-00736
Permit Status: Inspections
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 06/24/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 07/02/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 07/02/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 07/02/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 07/02/2024 | Post-Tension Inspection Report is required. |
| 07/02/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0624-00736
Permit Status: Inspections
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
| Date | Description | Comments |
|---|---|---|
| 06/24/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 07/02/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
| 09/27/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0624-00736
Permite Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/19/2024 | COT - RSPL - Rough Soil | N/A | Re-inspection required | 8/19/24: not under test. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0624-00736
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/19/2024 | COT - RSPL - Backwater Valve | Passed | ||
| 08/19/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 08/20/2024 | COT - RSPL - Rough Soil | Passed | 8/20/2024 okay to backfill. Shading required. | |
| 08/20/2024 | COT - RSPL - Sewer | Passed | 8/20/2024 okay to backfill. Shading required. | |
| 09/03/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 09/03/2024 | COT - RSBU - Preslab | Passed | ||
| 09/03/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 09/03/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 10/01/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 10/02/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 10/2/24: Above items are corrected. Okay to proceed with rough-in of mechanical, electrical, and plumbing. | |
| 11/18/2024 | BULD - Electrical Clearance | Passed | 11-18-24, okay to energize panel. Clearance issued to TEP. | |
| 11/18/2024 | COT - RSPL - Gas Pressure Test | Passed | 11-18-24, gas pressure test approved. | |
| 11/19/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 11-19-24, intermediates approved. Okay to continue with construction | |
| 12/10/2024 | COT - RSBU - Interior Shear Bracing | Passed | 12-10-24, interior shear bracing inspection approved plans prior. Okay to tape & texture drywall. | |
| 02/06/2025 | COT - BULD - SWG Clearance | Passed | Passed CLEARANCE SWG 2/6/25 | |
| 02/11/2025 | COT - RSEL - Electrical Final | Passed | Passed final 2/11/25 CLEARANCE ECO | |
| 02/11/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 2/11/25 | |
| 02/11/2025 | COT - RSME - Mechanical Final | Passed | Passed final 2/11/25 | |
| 02/11/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 2/11/25 | |
| 02/11/2025 | RSBU - Building Final | Passed | Passed final 2/11/25 | |
| 02/26/2025 | ENGR Engineering Final | Passed | Dumpster is still in front of the house sender picture by end of day please. |