Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0624-00734
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12867 E TORTOISE POINTE DR
Address NEW:
12867 E TORTOISE POINTE DR
Apply Date:
07/25/2024
Applicant:
Description:
SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Permit Reviews
Permit Number - TC-MDP-0624-00734
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/29/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/05/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0624-00734
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 06/24/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 08/05/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 08/05/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 08/05/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 08/05/2024 | Post-Tension Inspection Report is required. |
| 08/05/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0624-00734
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
| Date | Description | Comments |
|---|---|---|
| 06/24/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 09/27/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0624-00734
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/09/2024 | COT - RSPL - Backwater Valve | Passed | Backwater valve is installed between clean outs. Underground plumbing is installed and connected to main sewer system with green tracer wire in place, entire system under water test. Okay to shade pipes and backfill trenches. | |
| 09/09/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing is installed and connected to main sewer system with green tracer wire in place, entire system under water test. Okay to shade pipes and backfill trenches. | |
| 09/09/2024 | COT - RSPL - Yard Water Line | Passed | Under street pressure. Okay to shade and backfill trench. | |
| 09/09/2024 | COT - RSPL - Sewer | Passed | Underground plumbing is installed and connected to main sewer system with green tracer wire in place, entire system under water test. Okay to shade pipes and backfill trenches. | |
| 09/17/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 09/17/2024 | COT - RSBU - Preslab | Passed | ||
| 09/17/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 09/17/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/16/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Okay to proceed with rough-in of m, p, & e. | |
| 10/16/2024 | COT - RSBU - Roof Nailing | Passed | Okay to proceed with rough-in of m, p, & e. | |
| 11/27/2024 | BULD - Electrical Clearance | Passed | TEP ECO CLEARANCE ISSUED. | |
| 11/27/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete per plan. Okay to proceed with insulation and drywall installation. | |
| 11/27/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is under 15 psi of air pressure. Okay to proceed with other work. | |
| 12/16/2024 | COT - RSBU - Interior Shear Bracing | Passed | 12-16-24, interior shear bracing inspection approved. Okay to tape & texture. | |
| 02/05/2025 | COT - BULD - SWG Clearance | Passed | Passed CLEARANCE SWG 2/5/25 | |
| 03/04/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 03/04/2025 | ENGR Engineering Final | Passed | CO Ready | |
| 03/04/2025 | RSBU - Building Progress | Passed | ||
| 03/06/2025 | COT - RSEL - Electrical Final | Passed | 6 March 25 Pass |
|
| 03/06/2025 | COT - RSEL - Outdoor Lighting | Passed | 6 March 23 Pass |
|
| 03/06/2025 | COT - RSME - Mechanical Final | Passed | 6 March 25 Pass |
|
| 03/06/2025 | RSBU - Building Final | Passed | 6 March 25 Pass |