Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
07/25/2024
Applicant:
Description:
SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes

Permit Reviews

Permit Number - TC-MDP-0624-00734
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Start Date Submittal Complete Date Status  
07/29/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/05/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0624-00734
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Activity Conditions - 6
Date Name
06/24/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
08/05/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/05/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/05/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/05/2024 Post-Tension Inspection Report is required.
08/05/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0624-00734
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Date Description Comments
06/24/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
09/27/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0624-00734
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Completed Inspections - 22
Date Description Inspector Results Comments
09/09/2024 COT - RSPL - Backwater Valve Passed Backwater valve is installed between clean outs. Underground plumbing is installed and connected to main sewer system with green tracer wire in place, entire system under water test. Okay to shade pipes and backfill trenches.
09/09/2024 COT - RSPL - Rough Soil Passed Underground plumbing is installed and connected to main sewer system with green tracer wire in place, entire system under water test. Okay to shade pipes and backfill trenches.
09/09/2024 COT - RSPL - Yard Water Line Passed Under street pressure. Okay to shade and backfill trench.
09/09/2024 COT - RSPL - Sewer Passed Underground plumbing is installed and connected to main sewer system with green tracer wire in place, entire system under water test. Okay to shade pipes and backfill trenches.
09/17/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
09/17/2024 COT - RSBU - Preslab Passed
09/17/2024 COT - RSEL - Electrical Underground Passed
09/17/2024 COT - RSEL - Grounding/Bonding Passed
10/16/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Okay to proceed with rough-in of m, p, & e.
10/16/2024 COT - RSBU - Roof Nailing Passed Okay to proceed with rough-in of m, p, & e.
11/27/2024 BULD - Electrical Clearance Passed TEP ECO CLEARANCE ISSUED.
11/27/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in is complete per plan. Okay to proceed with insulation and drywall installation.
11/27/2024 COT - RSPL - Gas Pressure Test Passed Gas line is under 15 psi of air pressure. Okay to proceed with other work.
12/16/2024 COT - RSBU - Interior Shear Bracing Passed 12-16-24, interior shear bracing inspection approved. Okay to tape & texture.
02/05/2025 COT - BULD - SWG Clearance Passed Passed CLEARANCE SWG 2/5/25
03/04/2025 COT - RSPL - Plumbing Final Passed
03/04/2025 ENGR Engineering Final Passed CO Ready
03/04/2025 RSBU - Building Progress Passed
03/06/2025 COT - RSEL - Electrical Final Passed 6 March 25
Pass
03/06/2025 COT - RSEL - Outdoor Lighting Passed 6 March 23
Pass
03/06/2025 COT - RSME - Mechanical Final Passed 6 March 25
Pass
03/06/2025 RSBU - Building Final Passed 6 March 25
Pass

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-07-25_V1.PDF DOCUMENTS VIEW