Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
08/09/2024
Applicant:
Description:
SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes

Permit Reviews

Permit Number - TC-MDP-0624-00733
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Start Date Submittal Complete Date Status  
08/12/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/19/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0624-00733
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Activity Conditions - 6
Date Name
06/24/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
08/19/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/19/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/19/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/19/2024 Post-Tension Inspection Report is required.
08/19/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0624-00733
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Date Description Comments
06/24/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/19/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
09/27/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0624-00733
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Completed Inspections - 21
Date Description Inspector Results Comments
09/13/2024 COT - RSPL - Rough Soil Passed Underground plumbing is connected to main sewer line and under a water test with no leaks. Okay to shade pipe and backfill trenches.
09/13/2024 COT - RSPL - Sewer Passed Underground plumbing is connected to main sewer line and under a water test with no leaks. Okay to shade pipe and backfill trenches.
09/13/2024 COT - RSPL - Yard Water Line Passed Main water line is installed to meter and is under street pressure. Okay to shade pipe and backfill trench.
09/24/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
09/24/2024 COT - RSBU - Preslab Passed
09/24/2024 COT - RSEL - Electrical Underground Passed
09/24/2024 COT - RSEL - Grounding/Bonding Passed
10/09/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Okay to proceed with rough-in.
10/09/2024 COT - RSBU - Roof Nailing Passed Okay to proceed with rough-in.
12/02/2024 BULD - Electrical Clearance Passed 12-2-24, okay for panel to be energized by TEP (ECO).
12/02/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12-2-24, approved.
12/02/2024 COT - RSPL - Gas Pressure Test Passed 12-2-24, gas pressure test verified and residential intermediates approved. Okay to continue with construction.
12/27/2024 COT - RSBU - Interior Shear Bracing Passed 12/27/24 passed, ok to tape
02/13/2025 COT - BULD - SWG Clearance Passed Passed CLEARANCE SWG 2/13/25
02/24/2025 ENGR Engineering Final Passed CO Ready
02/28/2025 COT - RSEL - Outdoor Lighting Passed
02/28/2025 COT - RSME - Mechanical Final Passed
02/28/2025 COT - RSPL - Plumbing Final Passed
02/28/2025 RSBU - Building Progress Passed
03/05/2025 COT - RSEL - Electrical Final Passed 3/5/25 corrections made
03/05/2025 RSBU - Building Final Passed 3/5/25 corrections made