Permit: TC-MDP-0624-00732
Permit Details
Apply Date:
06/25/2024
Applicant:
Daria Hopkins
Description:
SFR MER1502580 T21-M0076 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0624-00732
Permit Status: Issued
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/29/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/05/2024 | APPROVED |
11/15/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/18/2024 | APPROVED |
06/27/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/28/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0624-00732
Permit Status: Issued
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Date | Description | Comments |
---|---|---|
06/27/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
06/27/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
06/27/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
06/27/2024 | Post-Tension Inspection Report is required. | |
06/24/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/24/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
11/18/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
06/27/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0624-00732
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Total Completed Inspections - 13
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/23/2024 | COT - RSPL - Rough Soil | Passed | ||
09/23/2024 | COT - RSPL - Yard Water Line | Passed | ||
09/23/2024 | COT - RSPL - Sewer | Passed | ||
10/03/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
10/03/2024 | COT - RSEL - Electrical Underground | Passed | ||
10/04/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 10/3/24: Plumbing not wrapped. 104/24: corrections made. |
|
10/04/2024 | COT - RSBU - Preslab | Passed | 10/3/24: Plumbing not wrapped. 104/24: corrections made. |
|
10/22/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
10/22/2024 | COT - RSBU - Roof Nailing | Passed | ||
11/19/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
11/22/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
11/25/2024 | BULD - Electrical Clearance | Passed | ||
12/05/2024 | COT - RSBU - Interior Shear Bracing | Passed |