Permit: TC-MDP-0624-00732
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
10649 E ROSY MARBLE DR
Address NEW:
10649 E ROSY MARBLE DR
Apply Date:
06/25/2024
Applicant:
Dana Petty
Description:
SFR MER1502580 T21-M0076 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0624-00732
Permit Status: Complete
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/29/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/05/2024 | APPROVED |
| 11/15/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/18/2024 | APPROVED |
| 06/27/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/28/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0624-00732
Permit Status: Complete
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
| Date | Description | Comments |
|---|---|---|
| 06/27/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 06/27/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 06/27/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 06/27/2024 | Post-Tension Inspection Report is required. | |
| 06/24/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 06/24/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 11/18/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 06/27/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0624-00732
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/23/2024 | COT - RSPL - Rough Soil | Passed | ||
| 09/23/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 09/23/2024 | COT - RSPL - Sewer | Passed | ||
| 10/03/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/03/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 10/04/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 10/3/24: Plumbing not wrapped. 104/24: corrections made. |
|
| 10/04/2024 | COT - RSBU - Preslab | Passed | 10/3/24: Plumbing not wrapped. 104/24: corrections made. |
|
| 10/22/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 10/22/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 11/19/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 11/22/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 11/25/2024 | BULD - Electrical Clearance | Passed | ||
| 12/05/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 02/06/2025 | COT - BULD - SWG Clearance | Passed | 2-6-25, okay for Southwest gas to install gas meter | |
| 02/14/2025 | COT - RSEL - Electrical Final | Passed | Construction is completed. All mechanical, electrical, and plumbing fixtures are installed and fully functional. Okay to issue Certificate of Occupancy. | |
| 02/14/2025 | COT - RSEL - Outdoor Lighting | Passed | Construction is completed. All mechanical, electrical, and plumbing fixtures are installed and fully functional. Okay to issue Certificate of Occupancy. | |
| 02/14/2025 | COT - RSME - Mechanical Final | Passed | Construction is completed. All mechanical, electrical, and plumbing fixtures are installed and fully functional. Okay to issue Certificate of Occupancy. | |
| 02/14/2025 | COT - RSPL - Plumbing Final | Passed | Construction is completed. All mechanical, electrical, and plumbing fixtures are installed and fully functional. Okay to issue Certificate of Occupancy. | |
| 02/14/2025 | ENGR Engineering Final | Passed | Site is good. | |
| 02/14/2025 | RSBU - Building Final | Passed | Construction is completed. All mechanical, electrical, and plumbing fixtures are installed and fully functional. Okay to issue Certificate of Occupancy. | |
| 02/14/2025 | RSBU - Building Progress | Passed | Construction is completed. All mechanical, electrical, and plumbing fixtures are installed and fully functional. Okay to issue Certificate of Occupancy. |