Permit: TC-MDP-0624-00730
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
10688 E ROSY MARBLE DR
Address NEW:
10688 E ROSY MARBLE DR
Apply Date:
08/20/2024
Applicant:
Dana Petty
Description:
SFR MER1502580 T21-M0076 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0624-00730
Permit Status: Complete
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/23/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/28/2024 | APPROVED |
| 01/28/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/28/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0624-00730
Permit Status: Complete
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
| Date | Description | Comments |
|---|---|---|
| 08/28/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 08/28/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 08/28/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 08/28/2024 | Post-Tension Inspection Report is required. | |
| 06/24/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 06/24/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 08/28/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0624-00730
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/15/2024 | COT - RSPL - Yard Water Line | Passed | 11-15-24, main water line approved. Okay to backfill-provide shading. | |
| 11/15/2024 | COT - RSPL - Sewer | Passed | 11-15-24, sewer connection approved. Okay to backfill-provide shading. | |
| 11/15/2024 | COT - RSPL - Rough Soil | Passed | 11-15-24, underground plumbing approved. Okay to backfill-provide shading. | |
| 11/21/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 11/22/2024 | COT - RSBU - Preslab | Passed | ||
| 11/25/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 11/25/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 12/11/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 12-11-24, exterior clips/sheathing per approved plans prior. Okay to continue with build. | |
| 12/11/2024 | COT - RSBU - Roof Nailing | Passed | 12-11-24, roof nailing,exterior clips/sheathing per approved plans prior. Okay to continue with build. | |
| 01/15/2025 | BULD - Electrical Clearance | Passed | Okay to energize electrical panel. ECO Clearance issued to TEP for 10688 E. Rosy Marble Dr. | |
| 01/15/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough in is complete. Okay to proceed with installation of insulation and drywall. | |
| 01/15/2025 | COT - RSPL - Gas Pressure Test | Passed | Gas line is under 15 psi of air pressure with no leaks. Okay to proceed. | |
| 02/03/2025 | COT - RSBU - Interior Shear Bracing | Passed | Sheet rock for interior shear walls is properly secured to the studs per the plan requirements for interior Okay to proceed with tape, texture, and paint. | |
| 03/19/2025 | COT - BULD - SWG Clearance | Passed | 3-19-25, okay for SWG to install meter. Clearance issued. | |
| 04/02/2025 | COT - RSEL - Electrical Final | Passed | Passed final 4/2/25 | |
| 04/02/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 4/2/25 | |
| 04/02/2025 | COT - RSME - Mechanical Final | Passed | Passed final 4/2/25 | |
| 04/02/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 4/2/25 | |
| 04/02/2025 | RSBU - Building Final | Passed | Passed final 4/2/25 | |
| 04/02/2025 | RSBU - Building Progress | Passed | Passed final 4/2/25 | |
| 04/07/2025 | ENGR Engineering Final | Passed | CO Ready finish side walk and move pile of DG |