Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
08/20/2024
Applicant:
Dana Petty
Description:
SFR MER1502580 T21-M0076 REV1 roof covering change

Permit Reviews

Permit Number - TC-MDP-0624-00730
Permit Status: Issued
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Start Date Submittal Complete Date Status  
08/23/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/28/2024 APPROVED Review Details
01/28/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/28/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0624-00730
Permit Status: Issued
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Date Description Comments
08/28/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/28/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/28/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/28/2024 Post-Tension Inspection Report is required.
06/24/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/24/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
08/28/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0624-00730
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Total Completed Inspections - 13
Date Description Inspector Results Comments
11/15/2024 COT - RSPL - Yard Water Line Passed 11-15-24, main water line approved. Okay to backfill-provide shading.
11/15/2024 COT - RSPL - Sewer Passed 11-15-24, sewer connection approved. Okay to backfill-provide shading.
11/15/2024 COT - RSPL - Rough Soil Passed 11-15-24, underground plumbing approved. Okay to backfill-provide shading.
11/21/2024 COT - RSEL - Electrical Underground Passed
11/22/2024 COT - RSBU - Preslab Passed
11/25/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
11/25/2024 COT - RSEL - Grounding/Bonding Passed
12/11/2024 COT - RSBU - Exterior Clips/Sheathing Passed 12-11-24, exterior clips/sheathing per approved plans prior. Okay to continue with build.
12/11/2024 COT - RSBU - Roof Nailing Passed 12-11-24, roof nailing,exterior clips/sheathing per approved plans prior. Okay to continue with build.
01/15/2025 BULD - Electrical Clearance Passed Okay to energize electrical panel. ECO Clearance issued to TEP for 10688 E. Rosy Marble Dr.
01/15/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough in is complete. Okay to proceed with installation of insulation and drywall.
01/15/2025 COT - RSPL - Gas Pressure Test Passed Gas line is under 15 psi of air pressure with no leaks. Okay to proceed.
02/03/2025 COT - RSBU - Interior Shear Bracing Passed Sheet rock for interior shear walls is properly secured to the studs per the plan requirements for interior Okay to proceed with tape, texture, and paint.

Documents

File Name Document Type  
151794 PT LOT 91 COMPLETE-2025-01-17_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 91 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 91 SPECIAL INSPECTION CERTIFICATE-2024-08-20_V1.PDF DOCUMENTS VIEW