Permit: TC-MDP-0624-00730
Permit Details
Apply Date:
08/20/2024
Applicant:
Dana Petty
Description:
SFR MER1502580 T21-M0076 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0624-00730
Permit Status: Issued
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/23/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/28/2024 | APPROVED |
01/28/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/28/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0624-00730
Permit Status: Issued
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Date | Description | Comments |
---|---|---|
08/28/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
08/28/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
08/28/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
08/28/2024 | Post-Tension Inspection Report is required. | |
06/24/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/24/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
08/28/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0624-00730
Permit Description: SFR MER1502580 T21-M0076 REV1 roof covering change
Total Completed Inspections - 13
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/15/2024 | COT - RSPL - Yard Water Line | Passed | 11-15-24, main water line approved. Okay to backfill-provide shading. | |
11/15/2024 | COT - RSPL - Sewer | Passed | 11-15-24, sewer connection approved. Okay to backfill-provide shading. | |
11/15/2024 | COT - RSPL - Rough Soil | Passed | 11-15-24, underground plumbing approved. Okay to backfill-provide shading. | |
11/21/2024 | COT - RSEL - Electrical Underground | Passed | ||
11/22/2024 | COT - RSBU - Preslab | Passed | ||
11/25/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
11/25/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
12/11/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | 12-11-24, exterior clips/sheathing per approved plans prior. Okay to continue with build. | |
12/11/2024 | COT - RSBU - Roof Nailing | Passed | 12-11-24, roof nailing,exterior clips/sheathing per approved plans prior. Okay to continue with build. | |
01/15/2025 | BULD - Electrical Clearance | Passed | Okay to energize electrical panel. ECO Clearance issued to TEP for 10688 E. Rosy Marble Dr. | |
01/15/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough in is complete. Okay to proceed with installation of insulation and drywall. | |
01/15/2025 | COT - RSPL - Gas Pressure Test | Passed | Gas line is under 15 psi of air pressure with no leaks. Okay to proceed. | |
02/03/2025 | COT - RSBU - Interior Shear Bracing | Passed | Sheet rock for interior shear walls is properly secured to the studs per the plan requirements for interior Okay to proceed with tape, texture, and paint. |