Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
06/25/2024
Applicant:
Daria Hopkins
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change

Permit Reviews

Permit Number - TC-MDP-0624-00729
Permit Status: Inspections
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Start Date Submittal Complete Date Status  
06/27/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/28/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0624-00729
Permit Status: Inspections
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Outstanding Activity Conditions - 5
Date Name
06/24/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/27/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/27/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/27/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/27/2024 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0624-00729
Permit Status: Inspections
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Date Description Comments
06/24/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/27/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0624-00729
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 9
Date Description Inspector Results Comments
09/30/2024 COT - RSPL - Rough Soil Passed Underground plumbing is installed and connected to the backwater valve and city sewer line. Entire system is under water test with no leaks. Okay to shade pipes and backfill trenches.
09/30/2024 COT - RSPL - Backwater Valve Passed Underground plumbing is installed and connected to the backwater valve and city sewer line. Entire system is under water test with no leaks. Okay to shade pipes and backfill trenches.
09/30/2024 COT - RSPL - Yard Water Line Passed Main water line to house is connected to the water meter, tracer wire installed, and under street pressure with no leaks. Okay to shade pipe and backfill trench.
09/30/2024 COT - RSPL - Sewer Passed Underground plumbing is installed and connected to the backwater valve and city sewer line. Entire system is under water test with no leaks. Okay to shade pipes and backfill trenches.
10/14/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
10/14/2024 COT - RSBU - Preslab Passed
10/14/2024 COT - RSEL - Electrical Underground Passed
10/22/2024 COT - RSBU - Exterior Clips/Sheathing Passed
10/22/2024 COT - RSBU - Roof Nailing Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 8 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 8 SPECIAL INSPECTION CERTIFICATE-2024-06-25_V1.PDF DOCUMENTS VIEW