Permit: TC-MDP-0624-00729
Permit Details
Apply Date:
06/25/2024
Applicant:
Daria Hopkins
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0624-00729
Permit Status: Inspections
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/27/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/28/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0624-00729
Permit Status: Inspections
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
06/24/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
06/27/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
06/27/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
06/27/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
06/27/2024 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0624-00729
Permit Status: Inspections
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Date | Description | Comments |
---|---|---|
06/24/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/27/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0624-00729
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/30/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing is installed and connected to the backwater valve and city sewer line. Entire system is under water test with no leaks. Okay to shade pipes and backfill trenches. | |
09/30/2024 | COT - RSPL - Backwater Valve | Passed | Underground plumbing is installed and connected to the backwater valve and city sewer line. Entire system is under water test with no leaks. Okay to shade pipes and backfill trenches. | |
09/30/2024 | COT - RSPL - Yard Water Line | Passed | Main water line to house is connected to the water meter, tracer wire installed, and under street pressure with no leaks. Okay to shade pipe and backfill trench. | |
09/30/2024 | COT - RSPL - Sewer | Passed | Underground plumbing is installed and connected to the backwater valve and city sewer line. Entire system is under water test with no leaks. Okay to shade pipes and backfill trenches. | |
10/14/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
10/14/2024 | COT - RSBU - Preslab | Passed | ||
10/14/2024 | COT - RSEL - Electrical Underground | Passed | ||
10/22/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
10/22/2024 | COT - RSBU - Roof Nailing | Passed |