Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
10346 E RED SLATE PL
Apply Date:
12/05/2024
Applicant:
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change (Model master plan TC-MDP-0123-00386)

Permit Reviews

Permit Number - TC-MDP-0624-00728
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change (Model master plan TC-MDP-0123-00386)
Start Date Submittal Complete Date Status  
02/04/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 02/05/2025 APPROVED Review Details
06/10/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/10/2025 REQUIRES RESUBMIT Review Details
01/29/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/31/2025 REQUIRES RESUBMIT Review Details
06/17/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 06/23/2025 APPROVED Review Details
12/12/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/20/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0624-00728
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change (Model master plan TC-MDP-0123-00386)
Date Description Comments
12/12/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
12/12/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
12/12/2024 Post-Installed Anchor Inspection Report is required.
12/12/2024 Post-Tension Inspection Report is required.
06/24/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/24/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/20/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0624-00728
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change (Model master plan TC-MDP-0123-00386)
Total Completed Inspections - 21
Date Description Inspector Results Comments
04/15/2025 COT - RSPL - Rough Soil Passed 4-15-25, underground plumbing verified as per plans. Okay to backfill with shading materials.
04/15/2025 COT - RSPL - Sewer Passed 4-15-25, main water line, sewer connection and underground plumbing verified as per plans. Okay to backfill with shading materials.
04/15/2025 COT - RSPL - Yard Water Line Passed 4-15-25, main water line, sewer connection and underground plumbing verified as per plans. Okay to backfill with shading materials.
04/23/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 4/23/25 ok to pour concrete
04/23/2025 COT - RSBU - Preslab Passed Passed 4/23/25 ok to pour concrete
04/23/2025 COT - RSEL - Electrical Underground Passed Passed 4/23/25 ok to pour concrete
04/23/2025 COT - RSEL - Grounding/Bonding Passed Passed 4/23/25 ok to pour concrete
05/01/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Passed 5/1/25
05/01/2025 COT - RSBU - Roof Nailing Passed Passed 5/1/25
05/19/2025 BULD - Electrical Clearance Passed Passed 5/19/25 CLEARANCE ECO
05/19/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed 5/19/25
05/19/2025 COT - RSPL - Gas Pressure Test Passed Passed 5/19/25
05/30/2025 COT - RSBU - Interior Shear Bracing Passed
07/11/2025 COT - BULD - SWG Clearance Passed Passed 7/11/25 CLEARANCE SWG
07/22/2025 COT - RSEL - Electrical Final Passed
07/22/2025 COT - RSEL - Outdoor Lighting Passed
07/22/2025 COT - RSME - Mechanical Final Passed
07/22/2025 COT - RSPL - Plumbing Final Passed
07/22/2025 ENGR Engineering Final Passed
07/22/2025 RSBU - Building Final Passed
07/22/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
242218 - HOUGHTON RESERVE - LOT 4 - PT REV6.16.25-2025-06-16_V1.PDF DOCUMENTS VIEW
LOT 4 SPECIAL INSPECTION CERTIFICATE REVISED2-2025-02-04_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 4 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 4 SPECIAL INSPECTION CERTIFICATE-2024-12-05_V1.PDF DOCUMENTS VIEW