Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
06/04/2024
Applicant:
Description:
SFR RKM45M T21-M0092 (Revision 2 structural cals and pages)

Permit Reviews

Permit Number - TC-MDP-0624-00712
Permit Status: Inspections
Permit Description: SFR RKM45M T21-M0092 (Revision 2 structural cals and pages)
Start Date Submittal Complete Date Status  
08/09/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/15/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0624-00712
Permit Status: Inspections
Permit Description: SFR RKM45M T21-M0092 (Revision 2 structural cals and pages)
Total Outstanding Activity Conditions - 6
Date Name
06/06/2024 Post-Tension Inspection Report is required.
06/06/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
08/15/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/15/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/15/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/15/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0624-00712
Permit Status: Inspections
Permit Description: SFR RKM45M T21-M0092 (Revision 2 structural cals and pages)
Date Description Comments
06/06/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
08/15/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0624-00712
Permit Description: SFR RKM45M T21-M0092 (Revision 2 structural cals and pages)
Total Completed Inspections - 20
Date Description Inspector Results Comments
09/13/2024 COT - RSPL - Rough Soil Passed Underground plumbing is connected to main sewer line and under a water test with no leaks. Okay to shade pipe and backfill trenches.
09/13/2024 COT - RSPL - Sewer Passed Underground plumbing is connected to main sewer line and under a water test with no leaks. Okay to shade pipe and backfill trenches.
09/13/2024 COT - RSPL - Yard Water Line Passed Main water line is installed to meter and is under street pressure. Okay to shade pipe and backfill trench.
09/26/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
09/26/2024 COT - RSBU - Preslab Passed
09/26/2024 COT - RSEL - Electrical Underground Passed
09/26/2024 COT - RSEL - Grounding/Bonding Passed
10/21/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Okay to proceed with M, P, AND E.
10/21/2024 COT - RSBU - Roof Nailing Passed Okay to proceed with M, P, AND E.
12/10/2024 BULD - Electrical Clearance Passed 12-10-24, panel okay to be energized. ECO clearance issued to TEP.
12/10/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12-10-24, intermediates approved. Okay to continue with construction.
12/10/2024 COT - RSPL - Gas Pressure Test Passed 12-10-24, gas pressure test verified at 15 psi.
12/31/2024 COT - RSBU - Interior Shear Bracing Passed 12/31/24 PASS
02/18/2025 COT - BULD - SWG Clearance Passed 2/18/25 approval for SWG clearance
03/07/2025 COT - RSEL - Electrical Final Passed 7 March 25
Pass
03/07/2025 COT - RSEL - Outdoor Lighting Passed
03/07/2025 COT - RSME - Mechanical Final Passed
03/07/2025 COT - RSPL - Plumbing Final Passed
03/07/2025 RSBU - Building Final Passed 7 March 25
Pass
03/07/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-08-08_V1.PDF DOCUMENTS VIEW