Permit Details

Status:
Issued
Type:
Model Building Permit
Address NEW:
6093 E CAMPOLINA TR
Apply Date:
06/03/2024
Applicant:
Brian Jones
Description:
Blackhawk T933 - Beech

Permit Reviews

Permit Number - TC-MDP-0624-00699
Permit Status: Issued
Permit Description: Blackhawk T933 - Beech
Start Date Submittal Complete Date Status  
03/06/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/11/2025 REQUIRES RESUBMIT Review Details
08/08/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 08/11/2025 APPROVED Review Details
06/04/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/05/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0624-00699
Permit Status: Issued
Permit Description: Blackhawk T933 - Beech
Date Description Comments
06/05/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/25/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/05/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/05/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/05/2024 Post-Tension Inspection Report is required.
09/25/2023 Post-Tension Inspection Report is required.
06/03/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/03/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/05/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
09/25/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0624-00699
Permite Description: Blackhawk T933 - Beech
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/26/2024 RSBU - Building Progress N/A Partial Pass 11-26-24, concrete was previously poured but had to be removed due to an issue with mixture. Therefore, slab was removed and new concrete will be added. All forms/ rebar verified as per approved plans. Okay to pour new slab.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0624-00699
Permit Description: Blackhawk T933 - Beech
Total Completed Inspections - 22
Date Description Inspector Results Comments
10/25/2024 COT - RSPL - Backwater Valve Passed 10-25-24, backwater valve in place.
10/25/2024 COT - RSPL - Rough Soil Passed 10-25-24, underground plumbing approved. Okay to backfill.
10/25/2024 COT - RSPL - Sewer Passed 10-25-24, sewer connection verified.
10/25/2024 COT - RSPL - Yard Water Line Passed 10-25-24, Approved. Okay to backfill.
10/30/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 10-30-24, per approved plans. Okay to pour slab.
10/30/2024 COT - RSBU - Preslab Passed 10-30-24, per approved plans. Okay to pour slab.
10/30/2024 COT - RSEL - Electrical Underground Passed 10-30-24, per approved plans. Okay to pour slab.
12/11/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Nailing and bolts per schedule, roof solid and per plans 12/11/24
12/11/2024 COT - RSBU - Roof Nailing Passed Nailing and bolts per schedule, roof solid and per plans 12/11/24
01/14/2025 BULD - Electrical Clearance Passed Passed 1/14/25 CLEARANCE ECO
01/14/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Passed 1/14/25 ok to drywall
01/14/2025 COT - RSEL - Grounding/Bonding Passed Passed 1/14/25
01/14/2025 COT - RSPL - Gas Pressure Test Passed Held pressure 1/14/25
01/27/2025 COT - RSBU - Interior Shear Bracing Passed 1/27/25 pass
02/06/2025 RSBU - Building Progress Passed mesh and rebar present at entry, ok to pour concrete 2/6/25
03/27/2025 COT - BULD - SWG Clearance Passed 27 March 25
SOUTHWEST GAS CLEARANCE: SWG
03/27/2025 COT - RSEL - Outdoor Lighting Passed
03/27/2025 COT - RSME - Mechanical Final Passed
03/27/2025 COT - RSPL - Plumbing Final Passed
04/02/2025 ENGR Engineering Final Passed Site is good. Ready for CofO.
04/04/2025 COT - RSEL - Electrical Final Passed 4 April 25
Pass
04/04/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BLACKHAWK RANCH LOT 39-START_05.31.24_V1.PDF DOCUMENTS VIEW
BLACKHAWK- SIC_BH LOT 39 - 6093 E CAMPOLINA TR-2024-06-03_V1.PDF DOCUMENTS VIEW