Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
6097 E CAMPOLINA TR
Apply Date:
06/11/2024
Applicant:
Cindy Nemo
Description:
Blackhawk T934 - Frasier

Permit Reviews

Permit Number - TC-MDP-0624-00697
Permit Status: Complete
Permit Description: Blackhawk T934 - Frasier
Start Date Submittal Complete Date Status  
04/08/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 04/14/2025 APPROVED Review Details
03/06/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/10/2025 REQUIRES RESUBMIT Review Details
06/14/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/17/2024 APPROVED Review Details
07/10/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/15/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0624-00697
Permit Status: Complete
Permit Description: Blackhawk T934 - Frasier
Date Description Comments
06/14/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/20/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
06/14/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/10/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/10/2024 Post-Tension Inspection Report is required.
09/25/2023 Post-Tension Inspection Report is required.
06/03/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/03/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
07/10/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.
09/25/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0624-00697
Permite Description: Blackhawk T934 - Frasier
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
04/03/2025 COT - BULD - SWG Clearance N/A Canceled
04/03/2025 COT - RSEL - Electrical Final N/A Canceled
04/03/2025 COT - RSEL - Outdoor Lighting N/A Canceled
04/03/2025 COT - RSME - Mechanical Final N/A Canceled
04/03/2025 COT - RSPL - Plumbing Final N/A Canceled

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0624-00697
Permit Description: Blackhawk T934 - Frasier
Total Completed Inspections - 21
Date Description Inspector Results Comments
10/30/2024 COT - RSPL - Rough Soil Passed 10-30-24, underground plumbing is per approved plans. Okay to backfill-provide shading.
10/30/2024 COT - RSPL - Sewer Passed 10-30-24, sewer connection is per approved plans. Okay to backfill-provide shading.
10/30/2024 COT - RSPL - Yard Water Line Passed 10-30-24, main water line is per approved plans. Okay to backfill-provide shading.
11/07/2024 COT - RSBU - Preslab Passed 11-7-24, preslab per approved plans. Okay to pour concrete.
11/07/2024 COT - RSEL - Electrical Underground Passed 11-7-24, electrical underground per approved plans. Okay to pour concrete.
11/07/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 11-7-24, setbacks per approved plans. Okay to pour concrete.
11/20/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 11-20-24, listed items from previous inspection were corrected. Okay to proceed with construction.
11/20/2024 COT - RSBU - Roof Nailing Passed 11-20-24, listed items from previous inspection were corrected. Okay to proceed with construction.
12/27/2024 BULD - Electrical Clearance Passed Passed 12/27/24
12/27/2024 COT - RSPL - Gas Pressure Test Passed Passed 12/27/24
12/27/2024 COT - RSEL - Grounding/Bonding Passed Passed 12/27/24
12/31/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12/31/24 corrections made
01/14/2025 COT - RSBU - Interior Shear Bracing Passed Passed 1/14/25 ok to tape
02/06/2025 RSBU - Building Progress Passed mesh and rebar present at entry, ok to pour concrete 2/6/25
04/07/2025 COT - BULD - SWG Clearance Passed 7 April 25
SOUTHWEST GAS CLEARANCE: SWG
04/07/2025 COT - RSEL - Electrical Final Passed
04/07/2025 COT - RSEL - Outdoor Lighting Passed 7 April 25
pass
04/08/2025 COT - RSME - Mechanical Final Passed
04/08/2025 COT - RSPL - Plumbing Final Passed 8 April 25
Pass
04/08/2025 ENGR Engineering Final Passed CO READY
04/10/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
11184 ALL PLANS-EPOXY ANCHOR SPECIAL INSPECTION-LETTER-2025-04-04_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BLACKHAWK LOT 38_ SIC - 6097 E CAMPOLINA TR-2024-06-11_V1.PDF DOCUMENTS VIEW
BLACKHAWK RANCH LOT 38-START_05.31.24_V1.PDF DOCUMENTS VIEW